Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Zone 7 Water Agency
Provide 4 EA iscsi san 3424s; dual-controller 2u chassis; two hot-swappable modular controllers; 64 gb san tiering cache (32 gb per controller); four 1 gbe data/administration ports (two per controller); four 10 gbe sfp+ ports (two per controller); four usb 3 ports (two per controller); twenty-four 2. 5-inch drive bays; two upgrade-card slots per controller; dual hot-swappable power supplies; rack kit; san management suite supporting unlimited snapshots with deduplication, unlimited luns with dynamic expansion, multisite wan replication, dual-controller failover, and removable-disk and tape-backup features. Includes two-year express depot level exchange service agreement. See attached file.
Posted Date
Jul 20, 2026
Due Date
Aug 3, 2026
Release: Jul 20, 2026
Zone 7 Water Agency
Close: Aug 3, 2026
Provide 4 EA iscsi san 3424s; dual-controller 2u chassis; two hot-swappable modular controllers; 64 gb san tiering cache (32 gb per controller); four 1 gbe data/administration ports (two per controller); four 10 gbe sfp+ ports (two per controller); four usb 3 ports (two per controller); twenty-four 2. 5-inch drive bays; two upgrade-card slots per controller; dual hot-swappable power supplies; rack kit; san management suite supporting unlimited snapshots with deduplication, unlimited luns with dynamic expansion, multisite wan replication, dual-controller failover, and removable-disk and tape-backup features. Includes two-year express depot level exchange service agreement. See attached file.
AvailableZone 7 Water Agency
Zone 7 Water Agency is soliciting proposals from qualified consultants to advance the conceptual design for the reclamation of mining ponds, in alignment with the agency's water supply goals. The selected consultant will develop engineering concepts that address surface mining permit and reclamation plan requirements for the agency's water infrastructure assets. Proposals must be submitted electronically through the Zone 7 e-Procurement Portal by the specified deadline.
Posted Date
-
Due Date
Jul 27, 2026
Release: -
Zone 7 Water Agency
Close: Jul 27, 2026
Zone 7 Water Agency is soliciting proposals from qualified consultants to advance the conceptual design for the reclamation of mining ponds, in alignment with the agency's water supply goals. The selected consultant will develop engineering concepts that address surface mining permit and reclamation plan requirements for the agency's water infrastructure assets. Proposals must be submitted electronically through the Zone 7 e-Procurement Portal by the specified deadline.
AvailableZone 7 Water Agency
Zone 7 Water Agency is soliciting proposals from qualified consultants to advance the conceptual design for the reclamation of mining ponds, in alignment with the agency's water supply goals. The selected consultant will develop engineering concepts that address surface mining permit and reclamation plan requirements for the agency's water infrastructure assets. Proposals must be submitted electronically through the Zone 7 e-Procurement Portal by the specified deadline.
Posted Date
-
Due Date
Jul 27, 2026
Zone 7 Water Agency
Close: Jul 27, 2026
Zone 7 Water Agency is soliciting proposals from qualified consultants to advance the conceptual design for the reclamation of mining ponds, in alignment with the agency's water supply goals. The selected consultant will develop engineering concepts that address surface mining permit and reclamation plan requirements for the agency's water infrastructure assets. Proposals must be submitted electronically through the Zone 7 e-Procurement Portal by the specified deadline.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Zone 7 Water Agency
The Water Shortage Contingency Plan for Zone 7 Water Agency serves as a strategic roadmap for managing water supplies during foreseeable and unforeseeable shortage events. It outlines six standard water shortage stages and corresponding response actions, including supply augmentation, demand reduction, communication protocols, and operational adjustments. The plan also details legal authorities, financial consequences, and refinement procedures. The overarching goal is to maintain a highly reliable municipal and industrial water supply system, meet existing and future demands, and proactively prevent catastrophic service disruptions.
This Urban Water Management Plan (UWMP) for Zone 7 Water Agency serves as a foundational planning document, addressing historical and projected water demands, supplies, and reliability for approximately 270,000 people. The plan outlines a projected demand increase to 51,000 acre-feet per year by 2050, primarily met by State Water Project imports (90%) and local watershed sources (10%). It emphasizes water conservation through demand management measures, includes a Water Shortage Contingency Plan, and identifies new water supply projects and water banking programs to ensure long-term reliability and manage potential shortages in multiple dry years starting from 2045.
The board meeting agenda focused on various operational and financial items, including the review of the investment policy, adoption of the Urban Water Management Plan, Water Shortage Contingency Plan, and the proposed two-year operating and capital budget. Discussions also covered the Chain of Lakes Chromium-6 removal study, safety program training, equipment removal, and personnel actions. Additionally, the board considered commemorations for departing directors, the recruitment and retention public hearing, authorization for a long-term water transfer agreement, and updates to the wastewater and nutrient management plans.
The committee discussed the status of the recycled water program, specifically regarding supply limitations during peak summer months and infrastructure investments. Additionally, the committee reviewed the state's new long-term water conservation standards, the potential impacts of legislation on indoor water usage, and the requirements for water loss reporting. The meeting concluded with a tour of the recycled water treatment plant and a discussion on future agenda items, including the Tri-Valley Local Hazard Mitigation Plan and efforts to address groundwater PFAS contamination.
The board received a project update on the Regional Groundwater Facilities Improvement Project, Phase II. Key discussion topics included the project workflow, estimated costs for supply wells, pipelines, and facility upgrades, and operations and maintenance plans for Phase III. The board was recommended to authorize the General Manager to negotiate and execute a cooperative agreement with the City of Pleasanton to proceed with the design, construction, and operation of the project phases.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Zone 7 Water Agency's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Assistant General Manager - Engineering, Operations & Maintenance
Premium
Access the largest public sector contact database
© 2026 Starbridge