Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project includes the surface preparation and painting of a 1.0-million-gallon elevated storage tank’s interior and exterior. The tank to be painted is a toro-spherical steel bowl supported by steel legs. Additionally, the project includes the replacement of the cathodic protection system and other minor electrical work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Project consists of all work associated with the construction of a 2.0-million-gallon composite elevated storage tank at the project site located on the southern side of shepherd dr, approximately. 4 miles west of us 75. This includes all yard piping, grading, paving, fencing, and all other items. This project also encompasses the dismantling of an existing .75- million-gallon steel elevated storage tank, located at an existing site on the northern side of Shepherd Dr approx .6 miles west of US 75. This includes the removal, abandonment, and relocation of items at the existing tank site
Posted Date
Nov 15, 2025
Due Date
Dec 16, 2025
Release: Nov 15, 2025
Close: Dec 16, 2025
Premium
Access the largest public sector contact database
Project consists of all work associated with the construction of a 2.0-million-gallon composite elevated storage tank at the project site located on the southern side of shepherd dr, approximately. 4 miles west of us 75. This includes all yard piping, grading, paving, fencing, and all other items. This project also encompasses the dismantling of an existing .75- million-gallon steel elevated storage tank, located at an existing site on the northern side of Shepherd Dr approx .6 miles west of US 75. This includes the removal, abandonment, and relocation of items at the existing tank site
The City of Sherman is soliciting bids to construct a 2.0‑million‑gallon composite elevated storage tank at a site on the south side of Shepherd Drive, including yard piping, grading, paving, fencing, and associated site work. The project also includes dismantling an existing 0.75‑million‑gallon steel elevated storage tank on Shepherd Drive and performing associated removals, abandonments, and relocations.
Posted Date
-
Due Date
Dec 16, 2025
Close: Dec 16, 2025
The City of Sherman is soliciting bids to construct a 2.0‑million‑gallon composite elevated storage tank at a site on the south side of Shepherd Drive, including yard piping, grading, paving, fencing, and associated site work. The project also includes dismantling an existing 0.75‑million‑gallon steel elevated storage tank on Shepherd Drive and performing associated removals, abandonments, and relocations.
AvailableProfessional inspection services during the painting of the warren county one-million-gallon elevated water storage tank.
Posted Date
Nov 20, 2025
Due Date
Jan 15, 2026
Release: Nov 20, 2025
Close: Jan 15, 2026
Professional inspection services during the painting of the warren county one-million-gallon elevated water storage tank.
AvailableConstruction of a 1 million gallon composite-style elevated water storage tank, control building, and associated appurtenances.
Posted Date
Dec 2, 2025
Due Date
Jan 15, 2026
Release: Dec 2, 2025
Close: Jan 15, 2026
Construction of a 1 million gallon composite-style elevated water storage tank, control building, and associated appurtenances.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis