CityVA
Posted
Aug 7, 2026
Sep 23, 2026
Pembroke Meadows Water Distribution System Replacement & Sanitary Sewer Replacement/Rehabilitation - Phase 2B
Work includes approx 3,980 LF 6" DI class 52 water main; 110 EA 1" type K copper service line (with water meter box replacement); 7,887 LF pavement patch (water main); 484 LF 8" PVC C900 gravity sewer; 712 LF 8" CIPP liner gravity sewer by steam or resin; 36.3 VF manhole rehabilitation by cementitious or epoxy.