CityNJ
Jul 30, 2026
Closes
Aug 13, 2026
South Street Roadway Improvements RFP
Street Roadway Improvements.
Description: Construction will improve the drainage along Clark Street and include replacement of the culvert pipe on driven piles that conveys water from the existing roadside ditch across Clark Street to the existing outfall on the west side (approx. 60 FT). The project also includes installation of new guardrail and aggregate shoulder along Clark Street, associated pavement restoration, and grading improvements to the existing ditch.
County · IN, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalProcurement and program contacts connected to Lake County.
Adjacent opportunities open for bidding right now.
CityNJ
Jul 30, 2026
Closes
Aug 13, 2026
Street Roadway Improvements.
CityFL
Jul 15, 2026
Closes
Aug 14, 2026
Such improvements will consist of: asphalt paving, concrete sidewalk, ancillary grading, concrete driveway aprons, curb and gutter, pedestrian accessible facilities (curb cut ramps), signage and striping, and site stabilization using performance sod.
CountyCA
Jul 29, 2026
Closes
Aug 12, 2026
Yuba County is soliciting sealed bids for the Emergency Culvert Replacement Project 2026, a public-works project involving replacement of drainage culverts along Marysville Road, Iowa Hill Road, and Woodruff Lane. The work includes traffic control, site management, water-pollution controls, clearing and grubbing, erosion control, and installation of corrugated steel and concrete pipe. The estimated project cost is $361,266, the work must be completed within 60 working days, and a valid Class A General Engineering contractor’s license is required.
CountyIN
Jul 29, 2026
Closes
Aug 18, 2026
The Board of Commissioners of the County of Allen is soliciting construction bids for replacement of an existing 36-inch culvert with a 42-inch culvert and widening of Springfield Center Road to 36 feet at the culvert location. The work includes associated roadway, drainage, excavation, backfill, grading, and pavement reconstruction, with a pre-bid meeting scheduled for August 6, 2026. This is an active construction procurement rather than a grant program, and bids are due August 18, 2026 at 10:00 a.m. EDT.