Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Santa Clara
Citywide emergency generator.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Foster City
Removal of Underground Storage Tank for Emergency Generator Replacements Project.
Posted Date
Oct 23, 2025
Due Date
Nov 20, 2025
Release: Oct 23, 2025
City of Foster City
Close: Nov 20, 2025
Removal of Underground Storage Tank for Emergency Generator Replacements Project.
AvailableState of Nevada Public Works Board
Work includes to replace emergency generator.
Posted Date
Nov 5, 2025
Due Date
Dec 3, 2025
Release: Nov 5, 2025
State of Nevada Public Works Board
Close: Dec 3, 2025
Work includes to replace emergency generator.
AvailableForsyth County
Progressive DESIGN/BUILD services: Significant cutting, off site hauling and disposal of spoil material, and regrading of the existing soil pile covering the majority of the planned generator facility. Site drainage and stormwater management improvements needed to accommodate the additional impervious surface created as result of this project. One 2500kW, 12.47kV generator at the electric utility service point; it is anticipated the generator will operate 18MGD of conventional filters and 6MGD of membrane process trains (total 24 MGD) and two 700 HP high service pumps (4.16kV, 9 MGD capacity each, for 18 MGD total of pumping capacity). The design builders engineer will coordinate with owner to identify load shed scheme and determine what will happen when plant is on generator power. See attached file.
Posted Date
Oct 23, 2025
Due Date
Dec 11, 2025
Release: Oct 23, 2025
Forsyth County
Close: Dec 11, 2025
Progressive DESIGN/BUILD services: Significant cutting, off site hauling and disposal of spoil material, and regrading of the existing soil pile covering the majority of the planned generator facility. Site drainage and stormwater management improvements needed to accommodate the additional impervious surface created as result of this project. One 2500kW, 12.47kV generator at the electric utility service point; it is anticipated the generator will operate 18MGD of conventional filters and 6MGD of membrane process trains (total 24 MGD) and two 700 HP high service pumps (4.16kV, 9 MGD capacity each, for 18 MGD total of pumping capacity). The design builders engineer will coordinate with owner to identify load shed scheme and determine what will happen when plant is on generator power. See attached file.
AvailableVillage of Carrier Mills
Purchase of one (1) new single phase 60kw generator which will operate on natural gas and one (1) new three phase 60kw generator which operate on propane gas.
Posted Date
Nov 12, 2025
Due Date
Dec 8, 2025
Release: Nov 12, 2025
Village of Carrier Mills
Close: Dec 8, 2025
Purchase of one (1) new single phase 60kw generator which will operate on natural gas and one (1) new three phase 60kw generator which operate on propane gas.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis