East Montgomery Utilities District
Special DistrictTN
Posted
-
Sep 10, 2026
Description: The work generally consists of public- and private-side lead service line replacement, excavation, trenching, backfilling, pavement restoration, water-service connections and associated site work throughout the City of Troy. The bid schedule specifically includes public- and private-side service replacements, copper pipe, potholes, crushed stone, common fill, concrete and stamped asphalt.
City · NY, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalDecision makers connected to this RFP from City of Troy.
Adjacent opportunities open for bidding right now.
East Montgomery Utilities District
Special DistrictTN
Posted
-
Sep 10, 2026
Work includes approx 23,800 LF 8" PVC C900 PVC water line; 400 LF 8" DR9 HDPE water line by directional bore; 320 LF 16" steel casing by jack and bore; 3,400 LF 3/4" PEXa service line.
Jackson County Housing Authority
Special DistrictIL
Posted
Aug 18, 2026
Sep 22, 2026
Remove and replace existing shingle roofing and roof accessories (drip edge, pipe vent flashings, vent caps, shingle over ridge vents, etc.) on designated buildings.
CityNC
Posted
Aug 26, 2026
Jan 20, 2027
Installation of approx., 50 LF of 14" PVC C900 DR18 water main, 7,019 LF of 6" PVC C900 DR18 water main, 158 LF of 4" PVC C900 DR18 water main, 359 LF of 16" HDPE DR11 water main, 5,175 LF of 2" PVC ASTM 2241 SDR21 water main and all associated valves, services, hydrants, and appurtenances. This project will replace existing water lines exhibiting poor water quality, low pressure, and leaks.
Marion Community School District 2
School DistrictIL
Posted
Aug 29, 2026
Sep 15, 2026
Work to include the abatement of existing asbestos containing floor tile, abatement of floor tile and wall base adhered with asbestos containing mastic, removal of existing doors, frames and hardware. New work to include the installation of new doors, frames and hardware, installation of new VCT tile flooring, installation of new wall base, painting of doors and frames, painting of existing partitions as required by demolition work, and installation of interior room identification signage.