Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replacement of approx. 3,770 LF of sewer mainline replacement, over three separate project areas (the Belt Route between Mctee Street and Railroad Avenue, alleyways between Lowell Avenue and Clark Street, and a separate Clark Street replacement area). There is approx. 345 LF of waterline replacement between Powell Street and 11th Street. Both sewer and waterline replacement areas include service line replacements from the mainline to the property lines of the residents in service along the replacement alignment. The work includes all appurtenances associated with the replacement of the mainlines. The project will include various hard surface repairs (asphalt, curb and gutter, sidewalk, gravel roadway repair, and curb wall replacement).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The County of San Bernardino (Department of Public Works - Solid Waste Management Division) is soliciting contractors to construct a Phase 1B liner system at the Landers Sanitary Landfill, including mobilization, excavation, installation of geosynthetic clay liners and geomembranes, drainage systems, and protective soil covers. The work includes substantial earthmoving (approx. 405,000 cubic yards of excavation) and installation of 285,000 sq ft of GCL, with performance to begin in April 2026 and completion within 180 working days from Notice to Proceed. Bidders must hold a valid California State Contractor 'A' license, register in the San Bernardino County ePro system, and provide bid security equal to 10% of the bid.
Posted Date
Dec 9, 2025
Due Date
Feb 3, 2026
Release: Dec 9, 2025
Close: Feb 3, 2026
The County of San Bernardino (Department of Public Works - Solid Waste Management Division) is soliciting contractors to construct a Phase 1B liner system at the Landers Sanitary Landfill, including mobilization, excavation, installation of geosynthetic clay liners and geomembranes, drainage systems, and protective soil covers. The work includes substantial earthmoving (approx. 405,000 cubic yards of excavation) and installation of 285,000 sq ft of GCL, with performance to begin in April 2026 and completion within 180 working days from Notice to Proceed. Bidders must hold a valid California State Contractor 'A' license, register in the San Bernardino County ePro system, and provide bid security equal to 10% of the bid.
AvailableWorks include approx. 142 LF of 15" Storm Sewer, C76, CL-IV, Trench A; 306 LF of 15" Storm Sewer Pre-Lining Preparation, Cleaning & Video Inspection; 499 LF of 10” RIFI-CIPP Comb. Sewer Sewer Lining, Pre-Liner; 940 LF of 8" D.I. CL 52 Water Main w/ Polywrap, Trench A.
Posted Date
Jan 22, 2026
Due Date
Feb 12, 2026
Release: Jan 22, 2026
Close: Feb 12, 2026
Works include approx. 142 LF of 15" Storm Sewer, C76, CL-IV, Trench A; 306 LF of 15" Storm Sewer Pre-Lining Preparation, Cleaning & Video Inspection; 499 LF of 10” RIFI-CIPP Comb. Sewer Sewer Lining, Pre-Liner; 940 LF of 8" D.I. CL 52 Water Main w/ Polywrap, Trench A.
AvailableProject includes all materials, equipment, transportation and labor necessary to reconstruct Alice’s Road, from south of Dellwood Drive to south of Douglas Parkway, from a two-lane rural section to a four-lane boulevard section including PCC pavement, PCC trail and pedestrian ramps. Project items include subgrade preparation and treatment, PCC roadway paving, trail and ramp paving, pavement markings, storm sewer installation, water main installation, Joint Utility Trench (JUT) installation, traffic control, erosion control, landscaping, plantings, and surface restoration. Specific project location along with the kind and approximate quantity of materials to be used shall be as set forth in the Plans and Specifications.
Posted Date
Jan 9, 2026
Due Date
Feb 5, 2026
Release: Jan 9, 2026
Close: Feb 5, 2026
Project includes all materials, equipment, transportation and labor necessary to reconstruct Alice’s Road, from south of Dellwood Drive to south of Douglas Parkway, from a two-lane rural section to a four-lane boulevard section including PCC pavement, PCC trail and pedestrian ramps. Project items include subgrade preparation and treatment, PCC roadway paving, trail and ramp paving, pavement markings, storm sewer installation, water main installation, Joint Utility Trench (JUT) installation, traffic control, erosion control, landscaping, plantings, and surface restoration. Specific project location along with the kind and approximate quantity of materials to be used shall be as set forth in the Plans and Specifications.
Construction of a 5-lane roadway with 4-12' travel lanes separated by a 15' median including a 4' bike lane and 5-foot concrete sidewalks in each direction. In addition, the project includes the construction of curb and gutter, closed drainage installation, hot mix asphalt paving, culvert construction, demolition, grading, earthwork, signing, and pavement markings.
Posted Date
Jan 16, 2026
Due Date
Feb 18, 2026
Release: Jan 16, 2026
Close: Feb 18, 2026
Construction of a 5-lane roadway with 4-12' travel lanes separated by a 15' median including a 4' bike lane and 5-foot concrete sidewalks in each direction. In addition, the project includes the construction of curb and gutter, closed drainage installation, hot mix asphalt paving, culvert construction, demolition, grading, earthwork, signing, and pavement markings.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis