Indian Trail Improvement District
Special DistrictFL
Aug 3, 2026
Closes
Oct 5, 2026
Pump Station Infrastructure Repair Pump Stations 2 and 3 RFP
Work includes infrastructure repair work at pump station 2 (ps-2) and pump station 3 (ps-3), both located within the m-1 drainage basin, replacement of the existing steel expanded metal grating decking with corrosion-resistant material in removable sections, repair and marine-grade epoxy coating of the structural beam deck subframe, replacement of four (4) 6-inch schedule 80 pipe deck columns (approximately 50% submerged), and fabrication and installation of a new heat exchanger beam support system including shop fabrication, sandblasting, epoxy coating, removal of the existing system, and installation of the new system.