City of Milford Hill Drive Street Lighting Improvements RFP
Work generally consists of street lighting improvements to include, but not limited to: - Temporary Traffic Control - Electrical Demolition - Electrical Work
Description: Work generally consists of street lighting improvements to include, but not limited to: - Temporary Traffic Control - Electrical Demolition - Electrical Work
City · IA, US
Decision makers connected to this RFP from City of Milford.
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityIA
Posted
-
Dec 10, 2026
Work generally consists of street lighting improvements to include, but not limited to: - Temporary Traffic Control - Electrical Demolition - Electrical Work
CityLA
Posted
Oct 22, 2026
Nov 17, 2026
Work includes 7,586 LF 1 1/2" trenching & backfilling; 914 LF of 1 1/2" jack & boring conduit; temporary signs & barricades; 251 LF 1 1/2" rigid galvanized steel; 8,500 LF of 1 1/2" PVC duct; 21,258 LF of 600V cable; 3 EA of 30A/4P lighting; 2 EA lead Area light Type D.
CityIN
Posted
Oct 29, 2026
Nov 18, 2026
Work includes 454 CY excavation, common; 16,555 dol storm water quality management budget; 468 SY subgrade treatment, type ii; 494 SY subgrade treatment, type iii; 4,428 SY subgrade treatment, type ibc; 494 SY geogrid, ib (undistributed); 996 CY structure backfill, type i; 362 CY compacted aggregate, no. 53; 22 CY compacted aggregate, no. 53l; 264 SY milling, asphalt, 1.5"; 95 ton qc/qa hma, 2, 58s, surface, 9.5mm; 164 ton qc/qa hma, 3, 58h, surface, 9.5mm; 109 ton qc/qa hma, 2, 58s, intermediate, 19.0mm; 257 ton qc/qa hma, 3, 58s, intermediate, 19.0mm. See attached file.
CitySC
Posted
Nov 13, 2026
Dec 16, 2026
The project will consist of the refurbishment of two (2) wastewater pumping stations. The work at each of the two (2) stations will consist of the installation of a bypass connection, removal of all pump station equipment, refurbishment of the wetwells, grading, installation of the new pump station equipment, electrical work and all appurtenances for a complete Installation. Solicitation #: AEC Project No. 26-012 Full Details / Download: American Engineering, 1300 12 St, Ste. A, Cayce, SC 29033