Special DistrictCA
Posted
Oct 29, 2026
Dec 2, 2026
2027 CIPP LINING PROJECT RFP
Rehabilitation of 6", 8", 10" and 12" sewer mains using cured-in-place pipe (CIPP) lining.
Description: The City of Marysville seeks bids for its 2027 sanitary sewer cured-in-place pipe (CIPP) lining project. Work includes traffic control, television inspection, cleaning, chemical grouting, CIPP lining, service connection liners, polyurea manhole rehabilitation, and temporary bypass pumping. Project locations are between 7th and 8th Street from Grove Street to S. Court Street and between 5th and 6th Street from Chestnut Street to Poplar Street, with bids submitted electronically through Bid Express.
City · OH, US
Adjacent opportunities open for bidding right now.
Special DistrictCA
Posted
Oct 29, 2026
Dec 2, 2026
Rehabilitation of 6", 8", 10" and 12" sewer mains using cured-in-place pipe (CIPP) lining.
Pleasant View Water And Sanitation District
Special DistrictCO
Posted
Oct 8, 2026
Nov 13, 2026
Work includes approx 1 LS 8" reliner installation in MH K83; 367 LF of 8" pipe - UV GRP CIPP between MH S19 - MH S16; 50 EA re-establish service connections; 33 SY additional permanent asphalt paving; 15 VF lining of manhole.
CityTX
Posted
Oct 29, 2026
Nov 13, 2026
Perform a cctv camera inspection and cipp spot lining repairs on the 6-inch sanitary sewer line from the manhole south to approx sta 4+42. 75.
CityMI
Posted
Oct 29, 2026
Dec 2, 2026
Project includes approx 42,630 LF of 8" to 23" Sewer Cleaning; 2,035 LF of 24" to 60" Sewer Cleaning; 42,630 LF of 8" to 23" Sewer Video Inspection; 2,035 LF of 24" to 60" Sewer Video Inspection; 22,550 LF of 8" Styrene-Free CIPP Sewer Lining; 2,700 LF of 10" Styrene-Free CIPP Sewer Lining; 14,000 LF of 12" Styrene-Free CIPP Sewer Lining; 1,550 LF of 15" Styrene-Free CIPP Sewer Lining; 1,330 LF of 18" Styrene-Free CIPP Sewer Lining; 600 LF of 21" Styrene-Free CIPP Sewer Lining; 1,400 LF of 24" Styrene-Free CIPP Sewer Lining; 525 LF of 30" Styrene-Free CIPP Sewer Lining; 200 LF of 36" Styrene-Free CIPP Sewer Lining; 2 EA of 8" CIPP Spot Repair; 2 EA of 10" CIPP Spot Repair; 2 EA of 12" CIPP Spot Repair; 2 EA of 15" CIPP Spot Repair; 2 EA of 18" CIPP Spot Repair; 2 EA of 21" CIPP Spot Repair; 2 EA of CIPP Lateral Liner (up to 18" in Length); 11 EA of Cutting Protruding Service Leads; 11 VF of Multi-Layer Polyurea Manhole Liner; 11 VF of Epoxy Manhole Liner; 6 VF of Internal Chimney Seal; 2 EA of 8" to 36" Packer Injection Joint Grouting; 11 GA of Manhole Chemical Grouting; 30 DAY of Traffic Control; and 10 DAY of Sewer Flow Control (4,000 GPM). For full-length main CIPP sewer lining, hot water curing is explicitly required and CIPP spot repairs and lateral liners, the specifications allow heat curing (hot water/steam) or ultraviolet (UV) / LED light curing in accordance with the manufacturer's recommended procedures.
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalDecision makers connected to this RFP from City of Marysville.