Summary
Work shall consist of hma resurfacing, bituminous surface removal, removal and replacement of pcc sidewalk and pcc curbing, hma patching, mh repairs, inlet repairs/replacement, pavement markings, and associated restoration and traffic control. Work includes pavement removal, full-depth 145 sy; bituminous surface removal, 2" 3831 sy; bituminous surface removal, var. Depth 15,711 sy; remove existing sign / sign support 2 ea; erosion control complete 1 ls; 2-ft wide pcc ribbon 75 lf; pcc barrier curb 43 lf; landscape restoration 1 ls; hma binder course, il-19. 0, n50 360 ton; hma surface course, il-9. 5, n50, mix c 3,037 ton; accessible parking signage / bollards 2 ea; pavement marking - line, 4" 1,302 lf; pavement marking - line, 8" 301 lf. See attached file.