Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes asphalt overlay and paving project involving road resurfacing with 1.5" and 2.5" depth overlays across multiple residential streets and some curb ramp repairs. Requires asphalt paving capabilities and street construction experience.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
2026 asphalt overlay, sealcoating and striping.
Posted Date
Dec 15, 2025
Due Date
Jan 14, 2026
Release: Dec 15, 2025
Close: Jan 14, 2026
2026 asphalt overlay, sealcoating and striping.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This Request for Proposal (RFP) is for asphalt mill and overlay work. The project involves the resurfacing of US 6. Bidding for this project is scheduled to close on January 16, 2026.
Posted Date
Dec 19, 2025
Due Date
Jan 16, 2026
Release: Dec 19, 2025
Close: Jan 16, 2026
This Request for Proposal (RFP) is for asphalt mill and overlay work. The project involves the resurfacing of US 6. Bidding for this project is scheduled to close on January 16, 2026.
AvailableConstruction, sequencing, and traffic control plan for overlaying existing asphalt concrete pavement in seven (7) different locations within the City of Federal Way. The work shall include to Hot Mix Asphalt (HMA Cl. 1/2" PG 58H-22) pavement overlay, roadway excavation, planing bituminous pavement, pavement repair, removal and replacement of curb and gutter, sidewalk, curb ramps, traffic curb, repairing or re-aligning manholes and catch basins, channelization, restoration, utility adjustments, and all items necessary to complete the work.
Posted Date
Jan 5, 2026
Due Date
Jan 26, 2026
Release: Jan 5, 2026
Close: Jan 26, 2026
Construction, sequencing, and traffic control plan for overlaying existing asphalt concrete pavement in seven (7) different locations within the City of Federal Way. The work shall include to Hot Mix Asphalt (HMA Cl. 1/2" PG 58H-22) pavement overlay, roadway excavation, planing bituminous pavement, pavement repair, removal and replacement of curb and gutter, sidewalk, curb ramps, traffic curb, repairing or re-aligning manholes and catch basins, channelization, restoration, utility adjustments, and all items necessary to complete the work.
AvailableMilling and repaving 106,000 SY with 10,700 tons of asphalt across multiple neighborhoods and roadways.
Posted Date
Dec 19, 2025
Due Date
Jan 16, 2026
Release: Dec 19, 2025
Close: Jan 16, 2026
Milling and repaving 106,000 SY with 10,700 tons of asphalt across multiple neighborhoods and roadways.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →