Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project consists of constructing roadway improvements consisting of pavement, overlay and associated items.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of Bogalusa requests bids to evaluate and perform emergency repairs to its sewer system, specifically to replace two influent screw pumps at the Wastewater Treatment Facility. Complete bid documents are available from the PEC Plan Room (Central Bidding/Central Auction House) and sealed bids are due at City Hall by 2:00 pm CST on December 17, 2025.
Posted Date
-
Due Date
Dec 17, 2025
Close: Dec 17, 2025
The City of Bogalusa requests bids to evaluate and perform emergency repairs to its sewer system, specifically to replace two influent screw pumps at the Wastewater Treatment Facility. Complete bid documents are available from the PEC Plan Room (Central Bidding/Central Auction House) and sealed bids are due at City Hall by 2:00 pm CST on December 17, 2025.
Premium
Access the largest public sector contact database
Work consist of 10 EA of remove existing lights, 870 LF of full depth excavation, 5 EA of mid-street light pole (type ii light), 12 EA of gateway light pole, 2 EA of ntersection light pole, 10 EA of bollard, proposed electrical design, install electrical work, 40 ton of hot mix asphalt, 60 TON of hot mix asphalt, 50 CY of dense graded aggegate base course, 96 LF of repair concrete curb and gutter, 50 SY of concrete sidewalk repair, 25 CY of dense graded aggregate base course if and where directed.
Posted Date
Oct 29, 2025
Due Date
Dec 30, 2025
Release: Oct 29, 2025
Close: Dec 30, 2025
Work consist of 10 EA of remove existing lights, 870 LF of full depth excavation, 5 EA of mid-street light pole (type ii light), 12 EA of gateway light pole, 2 EA of ntersection light pole, 10 EA of bollard, proposed electrical design, install electrical work, 40 ton of hot mix asphalt, 60 TON of hot mix asphalt, 50 CY of dense graded aggegate base course, 96 LF of repair concrete curb and gutter, 50 SY of concrete sidewalk repair, 25 CY of dense graded aggregate base course if and where directed.
AvailableCity of Moline Invitation to Re-Bid for property 2202 41st Street (CAP-E-49-51). Single General Contractor project for residential HVAC and electrical work: remove/replace basement gas furnace (install high-efficiency, intermittent-pilot, forced-air gas furnace, minimum 90% AFUE, thermostat controls, associated gas piping, duct and electrical connections) and replace electrical service with a new 100A single-phase residential service/panel. Contractors must obtain/pay for permits, complete inspections, and submit bids electronically.
Posted Date
Dec 5, 2025
Due Date
Dec 19, 2025
Release: Dec 5, 2025
Close: Dec 19, 2025
City of Moline Invitation to Re-Bid for property 2202 41st Street (CAP-E-49-51). Single General Contractor project for residential HVAC and electrical work: remove/replace basement gas furnace (install high-efficiency, intermittent-pilot, forced-air gas furnace, minimum 90% AFUE, thermostat controls, associated gas piping, duct and electrical connections) and replace electrical service with a new 100A single-phase residential service/panel. Contractors must obtain/pay for permits, complete inspections, and submit bids electronically.
AvailableProvide testing and repair services of transformers.
Posted Date
Nov 6, 2025
Due Date
Dec 30, 2025
Release: Nov 6, 2025
Close: Dec 30, 2025
Provide testing and repair services of transformers.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis