Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of drilling one municipal groundwater well.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
RFP for Ground Water Production Well SM-14 drilling services.
Posted Date
Nov 25, 2025
Due Date
Dec 31, 2099
Release: Nov 25, 2025
Close: Dec 31, 2099
RFP for Ground Water Production Well SM-14 drilling services.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Inspect and rehabilitate approx three (3) groundwater production wells and investigate/test pump one (1) groundwater production well. Work includes remove, inspect, and service motors and pumps, rehabilitate each well, equip each well with a pump and all other necessary equipment for flow testing (unless otherwise noted), maintain flow equipment during testing, and replace existing pump columns, if necessary. This work will also include flow testing two unequipped production wells.
Posted Date
-
Due Date
Jan 27, 2026
Release: -
Close: Jan 27, 2026
Inspect and rehabilitate approx three (3) groundwater production wells and investigate/test pump one (1) groundwater production well. Work includes remove, inspect, and service motors and pumps, rehabilitate each well, equip each well with a pump and all other necessary equipment for flow testing (unless otherwise noted), maintain flow equipment during testing, and replace existing pump columns, if necessary. This work will also include flow testing two unequipped production wells.
AvailableThe work includes; construction of two (2) 5" dia test-observation wells, construction and aquifer testing of a type i community water supply well known as test-production well no. 8.
Posted Date
Jan 14, 2026
Due Date
Feb 13, 2026
Release: Jan 14, 2026
Close: Feb 13, 2026
The work includes; construction of two (2) 5" dia test-observation wells, construction and aquifer testing of a type i community water supply well known as test-production well no. 8.
AvailableProvide test hole drilling, zone testing & production well construction. 1 LS test hole mobilization and demobilization; 1 LS clearing and grubbing and site work; 50 LF conductor casing; 100' bentonite grout and concrete; 1 LS drilling fluid and handling facilities; 8 EA bentonite seals; 750 LF test hole drilling; 1 LS downhole geophysical and mechanical surveys; 4 EA zone testing; 1 LS construction water piping; 400 LF temporary modular sound barriers; 1 LS test hole destruction; 1 LS production well mobilization and demobilization; 750 LF ream test hole to final diameter; 1 LS reamed test hole mechanical logging; 585 LF F&I lcs permanent 3" gravel fill tube; 550 LF F&I permanent 2' sounding tube; 230 LF f&i 8x12 sri annular filter- pack. See attached file.
Posted Date
Dec 17, 2025
Due Date
Feb 5, 2026
Release: Dec 17, 2025
Close: Feb 5, 2026
Provide test hole drilling, zone testing & production well construction. 1 LS test hole mobilization and demobilization; 1 LS clearing and grubbing and site work; 50 LF conductor casing; 100' bentonite grout and concrete; 1 LS drilling fluid and handling facilities; 8 EA bentonite seals; 750 LF test hole drilling; 1 LS downhole geophysical and mechanical surveys; 4 EA zone testing; 1 LS construction water piping; 400 LF temporary modular sound barriers; 1 LS test hole destruction; 1 LS production well mobilization and demobilization; 750 LF ream test hole to final diameter; 1 LS reamed test hole mechanical logging; 585 LF F&I lcs permanent 3" gravel fill tube; 550 LF F&I permanent 2' sounding tube; 230 LF f&i 8x12 sri annular filter- pack. See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →