CityMO
Posted
-
Sep 17, 2026
I&i Manhole and Sewer Main Relining Project RFP
Project consisting of lining manholes and sewer mains.
Description: The City of Benton City invites separate sealed bids for construction of the Sewer Relining and Replacement Project, HLA Project No. 26128. The work includes rehabilitation of 4,245 LF of 8-inch sanitary sewer using CIPP, removal and replacement of 2,901 LF of sanitary sewer main of varying sizes, bypass pumping, 4,481 SF of pavement repair, and related work. Bids are due at City Hall by 11:00 a.m. on September 16, 2026, will be publicly opened shortly thereafter, and the posting describes this as a construction solicitation rather than a grant-program notice while noting partial Public Works Board funding.
City · WA, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityMO
Posted
-
Sep 17, 2026
Project consisting of lining manholes and sewer mains.
Special DistrictCA
Posted
Aug 27, 2026
Oct 8, 2026
Valley Sanitary District is soliciting proposals from qualified consulting firms for surveying, hydraulic evaluation, engineering design, permitting support, plans and specifications, bidding support, and engineering services during construction. The project involves abandoning an existing 18-inch cast iron sewer crossing beneath the Union Pacific Railroad corridor and constructing a new 18-inch gravity sewer alignment outside the railroad right-of-way. The RFP was released on August 27, 2026, includes a mandatory pre-proposal meeting on September 16, 2026, and requires proposals by October 8, 2026, at 4:00 p.m. Pacific Time.
CityIA
Posted
Aug 22, 2026
Sep 3, 2026
The project generally includes removal and disposal of the existing roofing materials, inspection of the roof decking, installation of underlayment, ice and water protection, flashing, ventilation, asphalt shingles, cleanup, and related incidental work. Any necessary roof-sheathing replacement shall be quoted separately on a per-sheet basis.
CityNJ
Posted
Aug 17, 2026
Sep 17, 2026
Procurement of services for the Avenue F Sewer Replacement Project.
Decision makers connected to this RFP from City of Benton City.