Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of an 8,750 linear foot, 12-foot-wide granular surface trail for the City of Belle, including granular base, geotextile, a Trailhead Information Board Structure, concrete ADA components, water bottle filler, and site restoration.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes Trail – 8,750 linear feet of 12-foot-wide trail granular surface, 14-foot-wide trail granular base, non-woven geotextile separation/drainage fabric, Trailhead Information Board Structure, 4-inch thick concrete ADA slab-on-grade, 6-inch-thick concrete van accessible ADA parking, 4-inch thick concrete ADA sidewalk, water bottle filler installation and site restoration.
Posted Date
Dec 22, 2025
Due Date
Jan 14, 2026
Release: Dec 22, 2025
Close: Jan 14, 2026
Project includes Trail – 8,750 linear feet of 12-foot-wide trail granular surface, 14-foot-wide trail granular base, non-woven geotextile separation/drainage fabric, Trailhead Information Board Structure, 4-inch thick concrete ADA slab-on-grade, 6-inch-thick concrete van accessible ADA parking, 4-inch thick concrete ADA sidewalk, water bottle filler installation and site restoration.
AvailableThe City of Durham (General Services Department) is soliciting Construction Manager at Risk (CMAR) services for preconstruction and construction of the Durham Rail Trail Project, a roughly $45M project connecting east Durham to downtown and supported by state and federal grants. The CMAR will provide preconstruction services, cost and schedule control, and manage construction through GMP; construction is expected Jan 2027–Jun 2028.
Posted Date
Dec 4, 2025
Due Date
Jan 20, 2026
Release: Dec 4, 2025
Close: Jan 20, 2026
The City of Durham (General Services Department) is soliciting Construction Manager at Risk (CMAR) services for preconstruction and construction of the Durham Rail Trail Project, a roughly $45M project connecting east Durham to downtown and supported by state and federal grants. The CMAR will provide preconstruction services, cost and schedule control, and manage construction through GMP; construction is expected Jan 2027–Jun 2028.
AvailableConstruction of new connecting trail includes, 3,624 ft of silt fence; 2,058 CY of granular borrow; 12,267 SY of separation geotextile; 4,443 CY of roadway excavation; 57 CY of loose riprap; 101 ft of drainage pipe - 24", metal, silt-tight; 2,318 CY of untreated base course; 2,879 TON of hma - 1/2"; 2,301 ft of concrete curb sloping type; 3,282 ft of 54" ornamental fence; 10 CY of flowable fill - contingency item; 3,698 SY of strip and stockpile salvaged topsoil; 7,651 SY of broadcast seed; 118 gal of pavement marking paint.
Posted Date
Dec 13, 2025
Due Date
Jan 15, 2026
Release: Dec 13, 2025
Close: Jan 15, 2026
Construction of new connecting trail includes, 3,624 ft of silt fence; 2,058 CY of granular borrow; 12,267 SY of separation geotextile; 4,443 CY of roadway excavation; 57 CY of loose riprap; 101 ft of drainage pipe - 24", metal, silt-tight; 2,318 CY of untreated base course; 2,879 TON of hma - 1/2"; 2,301 ft of concrete curb sloping type; 3,282 ft of 54" ornamental fence; 10 CY of flowable fill - contingency item; 3,698 SY of strip and stockpile salvaged topsoil; 7,651 SY of broadcast seed; 118 gal of pavement marking paint.
AvailableProvide Capital Cascades Trail Segment 4 Construction. The Project will provide connectivity, water quality, stormwater, and recreational improvements The Project scope will include the installation of reno mattresses and gabion walls along the Central Drainage Ditch, pedestrian bridges, stormwater conveyance system, stormwater structures, utilities, sidewalks, lighting, and signalization. In addition, the Project includes the construction of recreational facilities including multiuse trails, landscaping, irrigation, park furnishings, educational signage, and custom park features.
Posted Date
Nov 19, 2025
Due Date
Jan 29, 2026
Release: Nov 19, 2025
Close: Jan 29, 2026
Provide Capital Cascades Trail Segment 4 Construction. The Project will provide connectivity, water quality, stormwater, and recreational improvements The Project scope will include the installation of reno mattresses and gabion walls along the Central Drainage Ditch, pedestrian bridges, stormwater conveyance system, stormwater structures, utilities, sidewalks, lighting, and signalization. In addition, the Project includes the construction of recreational facilities including multiuse trails, landscaping, irrigation, park furnishings, educational signage, and custom park features.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.