Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes Trail – 8,750 linear feet of 12-foot-wide trail granular surface, 14-foot-wide trail granular base, non-woven geotextile separation/drainage fabric, Trailhead Information Board Structure, 4-inch thick concrete ADA slab-on-grade, 6-inch-thick concrete van accessible ADA parking, 4-inch thick concrete ADA sidewalk, water bottle filler installation and site restoration.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Construction of an 8,750 linear foot, 12-foot-wide granular surface trail for the City of Belle, including granular base, geotextile, a Trailhead Information Board Structure, concrete ADA components, water bottle filler, and site restoration.
Posted Date
Dec 17, 2025
Due Date
Jan 14, 2026
Release: Dec 17, 2025
Close: Jan 14, 2026
Construction of an 8,750 linear foot, 12-foot-wide granular surface trail for the City of Belle, including granular base, geotextile, a Trailhead Information Board Structure, concrete ADA components, water bottle filler, and site restoration.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Design, purchasing, delivering and installing a 40' span prefabricated steel truss trail bridge and 2 rock gabions.
Posted Date
Dec 19, 2025
Due Date
Jan 23, 2026
Release: Dec 19, 2025
Close: Jan 23, 2026
Design, purchasing, delivering and installing a 40' span prefabricated steel truss trail bridge and 2 rock gabions.
AvailableThe project, in general, consists of, but is not limited to, the construction of an equestrian trail, wood rail fencing, rock slope protection and irrigation in the flood damaged areas.
Posted Date
Dec 19, 2025
Due Date
Jan 20, 2026
Release: Dec 19, 2025
Close: Jan 20, 2026
The project, in general, consists of, but is not limited to, the construction of an equestrian trail, wood rail fencing, rock slope protection and irrigation in the flood damaged areas.
AvailableProvide circuit breakers. Electrical components to include, Breakers, grounding bar, load center and hub. 25 EA.
Posted Date
Jan 5, 2026
Due Date
Jan 12, 2026
Release: Jan 5, 2026
Close: Jan 12, 2026
Provide circuit breakers. Electrical components to include, Breakers, grounding bar, load center and hub. 25 EA.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →