Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Baudette
Project consists of main lift station emergency generator installation and lift station generator connection modifications. Contractor to include a stationary 50kw natural gas generator, transfer switch, all raceways, conductors, switches, receptacles, necessary hangars and supports, natural gas extension, service entrance modifications, and generator plug connection modifications at lift station locations as noted. See outside link.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Germantown Purchasing Division
Provide design and easement acquisition consulting services for the proposed sanitary sewer lift station generator installation; easement survey layout, and negotiated acquisition; coordination with memphis light, gas, and water (mlgw) as required; determine appropriately sized generator for power requirements and location; establishment of criteria and requirements for the automatic transfer switch and power supply interruption communication links to notify the generator of circuit failures and supply power to the affected lift station; provide 100% design, specifications and bid sheet and support city staff through the pre-bid, bid, bid evaluations, and board of mayor and aldermen (bma) approval; provide construction contract administration (c/a) during construction and on-site inspection after construction bid award.
Posted Date
Oct 24, 2025
Due Date
Nov 20, 2025
Release: Oct 24, 2025
Germantown Purchasing Division
Close: Nov 20, 2025
Provide design and easement acquisition consulting services for the proposed sanitary sewer lift station generator installation; easement survey layout, and negotiated acquisition; coordination with memphis light, gas, and water (mlgw) as required; determine appropriately sized generator for power requirements and location; establishment of criteria and requirements for the automatic transfer switch and power supply interruption communication links to notify the generator of circuit failures and supply power to the affected lift station; provide 100% design, specifications and bid sheet and support city staff through the pre-bid, bid, bid evaluations, and board of mayor and aldermen (bma) approval; provide construction contract administration (c/a) during construction and on-site inspection after construction bid award.
AvailableEnergy Northwest
Replace the main generator at the Columbia Generating Station, nuclear power generating facility with a boiling water reactor, 1,200-megfawatt electric generation unit, during refuel outage 30.
Posted Date
Nov 12, 2025
Due Date
Feb 5, 2026
Release: Nov 12, 2025
Energy Northwest
Close: Feb 5, 2026
Replace the main generator at the Columbia Generating Station, nuclear power generating facility with a boiling water reactor, 1,200-megfawatt electric generation unit, during refuel outage 30.
AvailableCity of Marshall
The work includes the construction of the following: Removal and disposal of existing lift station pumps, valves, and piping. Furnishing and installing new lift station pumps, valves, and piping. Demolition of existing abandoned lift station structure. Replacement of sluice gate in existing control structure. Bypass pumping as required to accomplish the work.
Posted Date
-
Due Date
Dec 10, 2025
Release: -
City of Marshall
Close: Dec 10, 2025
The work includes the construction of the following: Removal and disposal of existing lift station pumps, valves, and piping. Furnishing and installing new lift station pumps, valves, and piping. Demolition of existing abandoned lift station structure. Replacement of sluice gate in existing control structure. Bypass pumping as required to accomplish the work.
AvailableCity of Adair Village
Construction and installation of a generator set, ATS, panel board, associated wiring and electrical work, and protective fences at two separate existing wastewater lift station.
Posted Date
Nov 4, 2025
Due Date
Dec 2, 2025
Release: Nov 4, 2025
City of Adair Village
Close: Dec 2, 2025
Construction and installation of a generator set, ATS, panel board, associated wiring and electrical work, and protective fences at two separate existing wastewater lift station.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis