Summary
Project consists of storm damage repair, and includes removal of damaged asphalt shingle roofing, installation of new underlayment, roofing, flashings at penetrations, and perimeter terminations of approximately 20 separate structures within the City. Most of these are full replacements of the existing roofs, but several are limited areas of the affected building. There are approximately 20 additional structures requiring painting of trim and/or siding, including fill or sealant of existing surface defect. One small structure will have existing vinyl siding completely removed, and new vinyl siding and trim installed over new building wrap. Several other miscellaneous repairs are needed.