CityCT
Posted
Nov 5, 2026
Dec 3, 2026
City Bid - Hope Street Culvert Repair RFP
Work include culvert repair.
Description: Repair of the Hope Street culvert.
Federal · DC, US
Adjacent opportunities open for bidding right now.
CityCT
Posted
Nov 5, 2026
Dec 3, 2026
Work include culvert repair.
CountyIL
Posted
Nov 2, 2026
Nov 18, 2026
Supply & deliver 1,440' of pipe culverts, class D, type 1 15".
Pennsylvania Department of Transportation
State AgencyPA
Posted
Nov 9, 2026
Dec 10, 2026
The project will replace the existing stone masonry arch culvert on SR 6011 (Market Street) over Leach Creek in Scranton with a precast reinforced concrete box culvert. The replacement is intended to improve safe access and hydraulic capacity while reducing water-surface elevations during 25- and 100-year storm events. Work includes removal of the existing structure, minimal approach-roadway work, and a 0.6-mile detour to maintain traffic.
CityNY
Posted
Aug 12, 2026
Dec 11, 2026
The project consists of the replacement of an existing culvert located on Westcott Road in the Town of Peru, Clinton County, NY. The culvert conveys the Salmon River from west to east. The existing culvert is a double-barrel culvert, consisting of one (1) 10'-0†diameter corrugated metal pipe (CMP), running approx. 51 LF, and one (1) 9'-6â€x 13'-0â€+/- elliptical culvert, running approx. 44 LF. The double-barrel culvert will be replaced with a bridge structure spanning 61 LF (between the centerlines of the abutments). The project will involve the construction of a temporary road to maintain access on Westcott Road, construction of cast-in-place bridge abutment foundations, installation of pre-cast bridge components (manufactured and delivered to the site by others), and reconstruction of Westcott Road. The project will also include the removal of the existing culvert system and recreation of the natural stream bed for the Salmon River. The bridge structure, abutments, and wingwalls are pre-formed structures to be supplied by InQuik Bridges (provided by CMC Bridge Systems). The bridge supplier is responsible for delivery to the site and for the material costs of the concrete for the bridge deck, abutments, and wingwalls, which are not to be included in the bid. The bidders are responsible for the installation costs of the concrete for the pre-manufactured bridge components, the forming, rebar, concrete, and construction of the cast-in-place foundations, as well as all of the sitework.
Decision makers connected to this RFP from Federal Emergency Management Agency.
Original attachments and procurement documents tied to this bid.
Federal RFP files are for Starbridge customers only.
You can request RFP files from all other buyer types for free on this site.