CityIA
Posted
Oct 15, 2026
Nov 5, 2026
WPC Sidewalk Improvements RFP
Project consists of removal of existing sidewalks, grading and subgrade preparation, installation of new concrete sidewalks with modified subbase, minor valve box adjustments, erosion control, and restoration of disturbed areas. Additional improvements, including the 7" concrete driveway.
