Retrieving RFP details
Release
Close
City of Wildomar
The City of Wildomar seeks a qualified consultant to prepare plans, specifications, and estimates (PS&E) and to provide professional engineering and environmental services for the Sedco Boulevard Roadway Safety Improvements and the MDP Line C Storm Drain Project. Services include project management, preliminary engineering, utility coordination, NEPA/CEQA environmental compliance, geotechnical investigation, design at 30/60/90/100% stages, bidding support, agency coordination, and optional post-award construction support and as-built preparation.
Fayette County
Bluegrass boulevard phase III- roadway improvements.
City of San Bernardino
The City of San Bernardino seeks bids for construction of a new storm drain channel on 19th Street, including grading, backfilling, compaction, paving, and concrete work such as cross gutters, ramps, spandrels, sidewalk, and curb and gutter. The project also includes tree removal and guardrail removal and replacement.
City of Santa Barbara
The City of Santa Barbara solicits bids for the FY26 Storm Drain Lining Project (Invitation #5073) to line existing corrugated metal pipes at multiple locations, including approximately 611 LF of 12-inch, 70 LF of 15-inch, and 100 LF of 18-inch, with traffic control and notifications required. Bids are submitted electronically, the project is estimated at $320,000 with a March 2026 start and 70 working days duration, and proposals are due 2025-11-20 at 3:00 PM (PST).
Release
Oct 01, 2025
Close
Nov 14, 2025