StateRI
Posted
Oct 16, 2026
Nov 19, 2026
PERMANENT PFAS WATER TREATMENT FACILITY, University of Rhode Island RFP
Design, Build and Construct the permanent PFAS Water Facility at URI
Description: Prequalification of general contractors for construction of a 1.3 mgd PFAS water treatment facility, including treatment systems, building and site work, and related pump replacements.
StateAgency · MA, US
Adjacent opportunities open for bidding right now.
StateRI
Posted
Oct 16, 2026
Nov 19, 2026
Design, Build and Construct the permanent PFAS Water Facility at URI
Martinsburg Municipal (Water And Sewer) Authority
Special DistrictPA
Posted
Oct 13, 2026
Nov 30, 2026
Erosion and sedimentation controls; excavation; construction of foundation/footer system, building to house PFAS - granulated activated Carbon (GAC) (Anthracite based) treatment process equipment and suspended solids filter system, all interconnecting piping, isolation valves, check valves, transfer pumps, pipe supports, fasteners, and appurtenances. Building construction includes windows, doors, HVAC, plumbing, foundation drains, roof, rood leaders and downspouts, and access/parking and walkways. The contract also requires the existing wellhead piping to be rerouted from the existing ion exchange (IX) treatment system to the new GAC system and install the proposed GAC effluent piping to the existing IX treatment train, as depicted and described within the contract documents. As well as all necessary appurtenances and restoration for said construction.
CityDE
Posted
Oct 9, 2026
Nov 19, 2026
This project includes the construction of a new, advanced wastewater treatment plant with nutrient removal for discharge to an existing onsite disposal system. The facility is designed for and average daily flow of 1.7 MGD and will receive raw wastewater from the Town's existing collection and conveyance system. Unit processes include: influent screening, grit removal, influent pump station, a pre-equalization basin (convertible to a future SBR basin), 2-train SBR, post equalization, effluent filtration, ultra-violet disinfection, and effluent pump station. Supporting systems include chemical addition, aerated sludge holding, sludge thickening, sludge dewatering and autothermal thermophilic aerobic sludge digestion. A central control building, utility building, electrical and controls systems, and other site improvements are included to result in a fully functional treatment facility.
CityAL
Posted
Nov 1, 2026
Nov 23, 2026
Work includes water treatment facility rehabilitation.
Solicitation files and supporting documents for this bid.
Decision makers connected to this RFP from Massachusetts Department of Environmental Protection.