Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Borough of Quarryville
Installation of approx. 2,730 LF of 8" Diameter CIPP liner, replacement and raising of 8 manhole frames and covers and the lining of 8 manholes with Sprayroq, by-pass pumping and restoration as shown on the map and as specified. Construction sequence provided hereinafter is general in nature and shall provide the basis of preparation of a detailed construction schedule by Contractor: 1.Install any by-pass pumping equipment. 2.Perform preinstallation cleaning and video documentation. 3. Install CIPP lining system. 4. Replace manhole frames and covers and raise manhole to existing ground surface. 5. Install any by-pass pumping and install Sprayroq lining system in manholes. 6. Site restoration.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Hutto
The City of Hutto is soliciting competitive sealed proposals for the Brushy Creek Wastewater Interceptor Phase 4 Project to construct approximately 16,300 linear feet of 48-inch and 42-inch wastewater interceptor and decommission the Enclave at Brushy Creek Lift Station. The project supports continued growth in Hutto by providing upgraded interceptor capacity and requires proposal security equal to 5% of the proposer’s total proposal amount.
Posted Date
-
Due Date
Dec 17, 2025
City of Hutto
Close: Dec 17, 2025
The City of Hutto is soliciting competitive sealed proposals for the Brushy Creek Wastewater Interceptor Phase 4 Project to construct approximately 16,300 linear feet of 48-inch and 42-inch wastewater interceptor and decommission the Enclave at Brushy Creek Lift Station. The project supports continued growth in Hutto by providing upgraded interceptor capacity and requires proposal security equal to 5% of the proposer’s total proposal amount.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Hutto
The City of Hutto is soliciting competitive sealed proposals for the Brushy Creek Wastewater Interceptor Phase 4 Project to construct approximately 16,300 linear feet of 48-inch and 42-inch wastewater interceptor and decommission the Enclave at Brushy Creek Lift Station. The project supports continued growth in Hutto by providing upgraded interceptor capacity and requires proposal security equal to 5% of the proposer’s total proposal amount.
Posted Date
-
Due Date
Dec 17, 2025
City of Hutto
Close: Dec 17, 2025
The City of Hutto is soliciting competitive sealed proposals for the Brushy Creek Wastewater Interceptor Phase 4 Project to construct approximately 16,300 linear feet of 48-inch and 42-inch wastewater interceptor and decommission the Enclave at Brushy Creek Lift Station. The project supports continued growth in Hutto by providing upgraded interceptor capacity and requires proposal security equal to 5% of the proposer’s total proposal amount.
AvailableGlendower Group, Inc.
Seeking qualified real estate development entities to submit proposals to serve as co-developer for phases 1 and 2 of the church street south redevelopment project.
Posted Date
Nov 5, 2025
Due Date
Dec 8, 2025
Release: Nov 5, 2025
Glendower Group, Inc.
Close: Dec 8, 2025
Seeking qualified real estate development entities to submit proposals to serve as co-developer for phases 1 and 2 of the church street south redevelopment project.
AvailableGreater New Haven Regional Water Pollution Control Authority
The proposed project includes the cured-in-place pipe (CIPP) lining rehabilitation of approx. 2,744 LF of 42” sewer pipes along the Lower Mill River Interceptor.
Posted Date
Oct 21, 2025
Due Date
Dec 18, 2025
Release: Oct 21, 2025
Greater New Haven Regional Water Pollution Control Authority
Close: Dec 18, 2025
The proposed project includes the cured-in-place pipe (CIPP) lining rehabilitation of approx. 2,744 LF of 42” sewer pipes along the Lower Mill River Interceptor.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →