CityVA
Aug 17, 2026
Closes
Sep 28, 2026
Central Energy Plant - Chiller #2 Replacement RFP
Work consists of the replacement of the existing chiller.
Description: Work consists of the replacement of the existing air-cooled split chiller system. New packaged air-cooled chiller utilizing r-32 refrigerant. Work includes removal of the existing rooftop condensing unit and interior evaporator, installation of a new outdoor packaged chiller on a housekeeping pad with security and privacy screening. The work also includes the installation of a new water to propylene glycol solution heat exchanger system dedicated to the existing rooftop air handling unit. T
StateAgency · MA, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityVA
Aug 17, 2026
Closes
Sep 28, 2026
Work consists of the replacement of the existing chiller.
Department Of Veterans Affairs Medical Center
Fire DepartmentMI
Aug 5, 2026
Closes
Sep 18, 2026
The facility has a primary/secondary chilled water loop to provide cooling medium for the majority of the air handling units (AHUs) and fan- coil units that distribute cool air to the interior of the buildings. The chiller plant is the sole source of cooling for the facility and has four (4) 1,000-ton and one (1) 500-ton chiller located in Building 23. All chillers are manufactured by York. The variable frequency drives associated with these 1,000-ton chillers are manufactured by Toshiba. The VFD for the 500-ton chiller is manufactured by York. The chillers and drives are all of the mid 1990s vintage.
Higher EducationOH
Jan 15, 2026
Closes
Sep 3, 2026
Work includes HVAC mechanical project involving replacement of chiller, cooling towers, and distribution pumps at university's west green chilled water plant.
FederalVA
Aug 6, 2026
Closes
Sep 11, 2026
Removal and replacement of building 35 chiller.
Decision makers connected to this RFP from Massachusetts Court System.