Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of early earthwork.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work consists of earthwork for construction of cell 9a, on an area owned by the SECCRA, as indicated in the bid specification.
Posted Date
Jan 8, 2026
Due Date
Feb 9, 2026
Release: Jan 8, 2026
Close: Feb 9, 2026
Work consists of earthwork for construction of cell 9a, on an area owned by the SECCRA, as indicated in the bid specification.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project generally consists of: earthwork for construction of embankments for two earthen raw water reservoir cells. Earthwork for excavating to bottom of reservoir cells. Earthwork for grading around the exterior of reservoir cells embankment. Additional miscellaneous earthwork and material handling. See outside link. Work includes 738,100 CY of embankment placement; 625,100 CY of embankment exterior grade placement; 67,800 CY of additional excavation cost for embankment shale keyways; 126,400 CY of haul material from south cell area to north cell; 21,100 CY of embankment cap material berm stockpile.
Posted Date
Jan 13, 2026
Due Date
Feb 17, 2026
Release: Jan 13, 2026
Close: Feb 17, 2026
Project generally consists of: earthwork for construction of embankments for two earthen raw water reservoir cells. Earthwork for excavating to bottom of reservoir cells. Earthwork for grading around the exterior of reservoir cells embankment. Additional miscellaneous earthwork and material handling. See outside link. Work includes 738,100 CY of embankment placement; 625,100 CY of embankment exterior grade placement; 67,800 CY of additional excavation cost for embankment shale keyways; 126,400 CY of haul material from south cell area to north cell; 21,100 CY of embankment cap material berm stockpile.
AvailableWork includes construction of water, sanitary sewer, drainage, reinforced concrete paving and site earthwork.
Posted Date
Jan 21, 2026
Due Date
Feb 5, 2026
Release: Jan 21, 2026
Close: Feb 5, 2026
Work includes construction of water, sanitary sewer, drainage, reinforced concrete paving and site earthwork.
AvailableProvide as-needed or emergency earthwork repair services. The proposed work may involve repairs to roadways, culverts, swales, force mains, gravity interceptor sewers which range in size from 8-60 IN within the service area. There may also be projects for which services may be required relating to other existing buildings and structures within the system. See attached files.
Posted Date
Jan 28, 2026
Due Date
Feb 20, 2026
Release: Jan 28, 2026
Close: Feb 20, 2026
Provide as-needed or emergency earthwork repair services. The proposed work may involve repairs to roadways, culverts, swales, force mains, gravity interceptor sewers which range in size from 8-60 IN within the service area. There may also be projects for which services may be required relating to other existing buildings and structures within the system. See attached files.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →