CityOH
Posted
Sep 1, 2026
Sep 15, 2026
Description: Furnish and deliver 2026 or newer Chevrolet Blazer EV in SS trim or higher. The Chevrolet Blazer shall be equipped with all standard equipment as listed in the factory data books and brochures. Exterior Color: Polar white Tricoat Interior Color: Black Powertrain: Electric Dual-Motor All-Wheel Drive Battery: 102kWh battery pack 190 kW DC fast charging capable Wheels and Tires: 22-inch Aluminum Wheels. 275/40ZR22 All Season Tires Infotainment: 17.7" diagonal color touchscreen display with Google built-in compatibility Charging Cords/Adapters: Vehicle shall include a portable Dual Level Charging Cord, GM NACS level 2 adapter, and NACS DC adapter. License and registration: Vehicle shall have CA Exempt license plates and registration prior to final delivery. Registration information and details will be provided to the winning bidder. Keys: Vehicle shall come with 4 full set of keys. Delivery/Transportation: Vehicle may be driven to the final delivery address, if vehicle is located within 100 miles of the delivery address. If vehicle is located more than 100 miles from the delivery address, the vehicle must be transported via flat bed.
SpecialDistrict · CA, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalDecision makers connected to this RFP from Los Angeles Department of Water and Power.
Adjacent opportunities open for bidding right now.
CityOH
Posted
Sep 1, 2026
Sep 15, 2026
The City of Dayton is soliciting bids from qualified dealers to provide new Chevrolet Equinox fleet vehicles, including gasoline-powered and battery-electric models, for municipal use. The initial contract term runs from September 1, 2026 through December 31, 2026, with options for up to three additional one-year renewals. Electronic bids are due September 15, 2026, at 3:00 PM Dayton Local Time, and vendors must provide vehicle specifications, warranty information, delivery details, firm pricing, and required compliance documentation.
CountyNJ
Posted
Aug 26, 2026
Sep 17, 2026
Supply and deliver two (2) 2027 Chevrolet bolt EV.
CityCA
Posted
-
Oct 8, 2026
Installation of two (2) 180-kW all-in-one DC fast charging stations for Phase II and Phase III, including associated electrical and civil infrastructure work.
CityIL
Posted
Apr 17, 2026
Sep 28, 2026
Furnishing, installing, configuring, maintenance and support of EVSE charging stations at designated City site locations.