Description: The Public Utilities Commission for the Municipality of Chatham-Kent seeks consulting engineering services to upgrade and expand Chatham Sanitary Pumping Station #3 and its associated sanitary forcemain infrastructure. The assignment includes environmental assessment, preliminary and detailed design, regulatory approvals, tendering, construction administration, commissioning, start-up, and post-construction services. Work covers existing-station upgrades, a new twin sanitary forcemain with a Thames River crossing, and preliminary design for future long-term pumping-station upgrades.
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
The City of Slidell is seeking sealed bids to upgrade the PS 200 Lindberg Sewer Lift Station (Slidell Job No. 300-120, Bid No. 27-B008). Bidders must hold a Louisiana contractor's license in Municipal and Public Works Construction and attend and sign in at the mandatory pre-bid meeting on November 4 at 10:00 a.m. Bids must include 5% bid security and be delivered by November 19, 2026, at 10:00 a.m. Central Time.
The City of Slidell is seeking sealed bids to upgrade the PS 200 Lindberg Sewer Lift Station (Slidell Job No. 300-120, Bid No. 27-B008). Bidders must hold a Louisiana contractor's license in Municipal and Public Works Construction and attend and sign in at the mandatory pre-bid meeting on November 4 at 10:00 a.m. Bids must include 5% bid security and be delivered by November 19, 2026, at 10:00 a.m. Central Time.
Work include upgrade of pump station. General construction shall include architectural, mechanical piping, valve, pump and related equipment. other contract will include electrical, plumbing and hvac upgrades.
Key Contacts on this RFP
Decision makers connected to this RFP from Chatham-Kent.
From the first pre-RFP signals to the published RFP and its files.
Board meeting
478 days before RFP
The consultant recommended a 10-year programme of detailed condition assessments for all PUC pumping stations and treatment facilities.
See sourceHide source
think that the PUC should immediately begin detailed condition assessments of all the pumping stations and treatment facilities they do do building condition assessments ments, but um from staff resources, not only in the PUC, but also in Chadam. Um you know, it's difficult to get those assessments done. We feel that you should do a 10-year program and
The PUC water and wastewater master plan update was initiated, with completion targeted for approximately March 2027, and the Southwest Chatham servicing study was to be incorporated into it.
See 2 sourcesHide sources
so last last year obviously came forward with the the 2023 uh PUC water and wastewater master plan. Um obviously there's a number of reports on that and it was recommended that it be revisited based on some you know up-to-ate information. Um so that process has been initiated. Uh uh the target is to have that completed roughly about this time next year. Um…
The Housing Needs Assessment reported capacity needs at over fifty wastewater pumping stations and eight sewer upsizing projects, with water and wastewater upgrades projected at $1.2 billion over the next decade.
See sourceHide source
The report breaks down wastewater system needs into several subsections, including pumping station capacity, the hydraulic capacity of sewer collection, and wastewater treatment requirements. It identifies capacity needs at over fifty pumping stations and highlights the need for eight sewer upsizing projects to address capacity issues. Regarding wastewater…
Municipality of Chatham-Kent Strategic Housing Action Plan 2026-2050
RFP published
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
so there is two meetings in the summer and so we deferred it we first talked about at the June 23rd meeting uh and then deferred it to the July 14th meeting and and uh and that's when the recommendations uh were were were approved. Uh, one of those recommendations was for an update to to the recent master plan to be done that um, uh, Darren uh, could talk…