Southern Delaware County Authority - Maintenance of the Sanitary Sewer System RFP
Posted
Oct 30, 2026
Nov 13, 2026
High Pressure Vacuum Truck with tools, equipment and Labor; Bucket Machines with tools, equipment and labor; Television Inspection with all required equipment and labor (min. 4 hr. charge); Chemical Grouting with required equipment, material, tools and labor (min. 10 joints); Root Treatment with required equipment, material, tools and labor (min. 300 LF).



