CityVT
Jul 24, 2026
Closes
Aug 19, 2026
Williston Road Water Valve Replacements
Project includes: the excavation of roadway materials, the replacement and installation of water system components including gate valves and valve boxes, 3-way gate valve assemblies, water line tees, curb stops, and water service lines. Work includes backfill and restoration of excavation sites to match existing conditions including curbing, concrete sidewalk, and Type II bituminous pavement repair (up to 6” thick), etc.