Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
1 LS Mobilization; 1 LS Temporary Protection and Direction of Traffic; 2 EA Sequential Arrow Signs; 1,650 SF Temporary Signs; 4 EA Portable Changeable Message Signs; 128 HR Flaggers; 2 EA Flagger Station Lighting; 71 EA Railroad Flagger Services; 12 EA Temporary Barricades, Type II; 23 EA Temporary Barricades, Type III; 125 EA Temporary Plastic Drums; 570 F Temporary Striping; 462 SF Temporary Pavement Bars; 6,540 F Stripe Removal; 500 SF Legend Removal; 78 SF Bar Removal; 913 F Temporary Barrier; 6 EA Temporary Impact Attenuator Narrow Site System; 4 EA Moving Temporary Impact Attenuator Narrow Site System; 1 EA Repair Temporary Impact Attenuator Narrow Site System; 75 F Minimum Deflection Bridge Temporary Barrier; 1 LS Temporary Illumination; 1 LS Temporary Traffic Signal; 1 LS Temporary Interconnect System; 2,190 F Pedestrian Channelizing Devices; 1 EA Temporary Curb Ramp, Parallel; 1 LS Construct and Remove Temporary Access Road, South; 1 LS Construct and Remove Temporary Access Road, North; 1 LS Temporary Work Access and Containment; 1 LS Bridge Jacking at Bent 1; 1 LS Bridge Jacking at Bent 3; 32 FT Temporary Type A Protective Fence; 1 LS Erosion Control; 2 EA Concrete Washout Facility; 1 EA Construction Entrance, Type 4; 1,810 F Sediment Barrier, Type 8; 2 EA Inlet Protection, Type 10; 5 EA Inlet Protection, Type 11; 10 EA Straw Bale; 1 LS Pollution Control Plan; 1 LS CWRR Report; 1 LS Removal of Structures and Obstructions; 46 F Removal of Concrete Barrier; 435 CY Keyed Riprap, Class 700; 1 LS Bridge Removal Work; 1 LS Extra for Salvaging and Stockpiling Bridge; 101 SY Class 2 Preparation; 1 LS Shoring, Cribbing, and Cofferdams; 1 LS Structural Excavation; 1 LS Granular Structural Backfill; 1 LS Reinforcement, Grade 60; 1 LS General Structural Concrete, Class 4000; 1 LS General Structural Concrete, Class 4000, Drilled Shaft; 460 SY Surface Texturing; 564 SY Reinforced Concrete Bridge Approach Slabs; 2,020 SY Furnish MPCO Material; 2,020 SY Construct MPCO; 1 LS Structural Steel, Longitudinal Seismic Restrainers; 1 LS Structural Steel, Transverse Seismic Restrainers; 64 EA stainless Steel Bridge Bearings; 120 FT GRC Conduit System, 2" Diameter; 57 FT GRC Conduit System, 3 Inch Diameter; 1 LS Precompressed Foam Silicone Joint Seal; 1 LS 32 Inch Vertical Concrete Parapet Rail, Modified; 1 LS Type "F" Concrete Rail, Modified; 1 LS Reinstall 2-Tube Steel Railing; 1 LS Reinstall Pedestrian Fencing; 1 LS Reinstall Traffic Fencing; 1 LS Reconstruct MSE Wall Coping; 74 SY 24 Inch Asphalt Concrete Pavement Repair; 46 FT Concrete Barrier; 50 EA Mono-Directional White Type IAR Markers; 31 EA Bi-Directional Yellow Type IAR Markers; 6,540 F Thermoplastic, Sprayed, Surface, Non-Profiled; 9 EA Pavement Legend, Type B-HS: Arrows; 5 EA Pavement Legend, Type B-HS: Bicycle Lane Stencil; 315 SF Pavement Legend, Type B-HS; 1 LS Removing and Reinstalling Existing Illumination Systems; 1 LS Traffic Signal Modification, Chambers Street and Roosevelt Boulevard; 1 LS Interconnect System; .36 AC Permanent Seeding; 1 F 24 F x 96" Chain Link Double Gates; 24 F Removing and Rebuilding Fence; 400 HR On the Job Training.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Seismic Recording System.
Posted Date
Dec 5, 2025
Due Date
Jan 13, 2026
Release: Dec 5, 2025
Close: Jan 13, 2026
Seismic Recording System.
AvailableSeeking applications for energy efficiency projects involving LED lighting retrofits in Maine public PreK-12 schools1. This initiative falls under Efficiency Maine's Commercial and Industrial Prescriptive Initiatives (CIPI) and is referred to as the School Lighting Retrofits Funding Opportunity Notice, FON-023-2026. This initiative offers higher incentives than typically provided under the CIPI, with the intent of accelerating the conversion to efficient LED lighting in schools across the state.
Posted Date
Nov 7, 2025
Due Date
Jun 30, 2026
Release: Nov 7, 2025
Close: Jun 30, 2026
Seeking applications for energy efficiency projects involving LED lighting retrofits in Maine public PreK-12 schools1. This initiative falls under Efficiency Maine's Commercial and Industrial Prescriptive Initiatives (CIPI) and is referred to as the School Lighting Retrofits Funding Opportunity Notice, FON-023-2026. This initiative offers higher incentives than typically provided under the CIPI, with the intent of accelerating the conversion to efficient LED lighting in schools across the state.
The City of St. Paul, Missouri is soliciting sealed bids for the St. Paul Road Bridge Replacement, a construction project that includes building a box culvert along with roadway and drainage improvements. Bids are due January 15, 2026 at 12:00 pm local time at St. Paul City Hall, and bidders must meet MoDOT qualification requirements; DBE participation is encouraged and standard public works wage and bonding provisions apply. The project improves safety and capacity by replacing the existing bridge and widening the roadway.
Posted Date
Dec 22, 2025
Due Date
Jan 15, 2026
Release: Dec 22, 2025
Close: Jan 15, 2026
The City of St. Paul, Missouri is soliciting sealed bids for the St. Paul Road Bridge Replacement, a construction project that includes building a box culvert along with roadway and drainage improvements. Bids are due January 15, 2026 at 12:00 pm local time at St. Paul City Hall, and bidders must meet MoDOT qualification requirements; DBE participation is encouraged and standard public works wage and bonding provisions apply. The project improves safety and capacity by replacing the existing bridge and widening the roadway.
This RFP is for the St. Paul Road Bridge Replacement, including furnishing materials, tools, equipment, and labor for constructing a box culvert, roadway, and drainage improvements.
Posted Date
Dec 22, 2025
Due Date
Jan 15, 2026
Release: Dec 22, 2025
Close: Jan 15, 2026
This RFP is for the St. Paul Road Bridge Replacement, including furnishing materials, tools, equipment, and labor for constructing a box culvert, roadway, and drainage improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis