Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work include approx. 12,050 Strand FT of installation of aerial strand, including ground bonds; 11,142 of Fiber FT of lash of single aerial fiber cable on new strand, place fiber tags (tags provided by POW); 91,600 fiber FT of install fiber and detectable mule tape in new UG conduit, any size fiber; 69,517 FT of install 2" HDPE conduit (SDR 11) plow or trench 48" depth; 22,494 FT of install 1" HDPE conduit (SDR 11) plow or trench, 18" depth (drop conduit); 10,205 fiber FT of install fiber drop in 1" or 2" conduit; 17,075 FT of bore 2" HDPE conduit; 2,515 FT of bore 1" HDPE conduit; 1,908 FT of install 1" HDPE conduit (SDR 11) plow or trench, 48" depth (drop conduit); 1,754 FT of solid rock sawing and placement of 1" or 2" HDPE conduit up to 48" depth; see the attached file for more details.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Qualified contractors for the Fiber Phase 2 Construction Project. The work under this project generally consists of building the necessary components to create the high-speed Fiber-To-The-Premise (FTTP) Optical Network (XGS-PON) communications Network (the Project) within the City’s defined service area and preparing it to deliver fiber-to-home services. The system shall be a fully operations high-speed communications network supporting Internet protocol technology and allowing users access to and from the Internet.
Posted Date
Nov 6, 2025
Due Date
Dec 16, 2025
Release: Nov 6, 2025
Close: Dec 16, 2025
Qualified contractors for the Fiber Phase 2 Construction Project. The work under this project generally consists of building the necessary components to create the high-speed Fiber-To-The-Premise (FTTP) Optical Network (XGS-PON) communications Network (the Project) within the City’s defined service area and preparing it to deliver fiber-to-home services. The system shall be a fully operations high-speed communications network supporting Internet protocol technology and allowing users access to and from the Internet.
AvailableRelease: Dec 4, 2025
Close: Dec 19, 2025
Provide fiber extension project.
AvailableConstruct an aerial and underground fiber optic system.
Posted Date
Nov 25, 2025
Due Date
Dec 31, 2025
Release: Nov 25, 2025
Close: Dec 31, 2025
Construct an aerial and underground fiber optic system.
AvailableWork include installation of fiber optic cable, fiber-optic cable equipment, fiber network switches (installation and programming), replacement of traffic signal vehicle heads and mounting, conduit, conductors, cables (removal, reinstallation, and replacement), traffic signal controllers, conflict monitors, fiber vaults, pull boxes, programming signal timing, and all appurtenant work and other items.
Posted Date
Nov 13, 2025
Due Date
Jan 15, 2026
Release: Nov 13, 2025
Close: Jan 15, 2026
Work include installation of fiber optic cable, fiber-optic cable equipment, fiber network switches (installation and programming), replacement of traffic signal vehicle heads and mounting, conduit, conductors, cables (removal, reinstallation, and replacement), traffic signal controllers, conflict monitors, fiber vaults, pull boxes, programming signal timing, and all appurtenant work and other items.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis