Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work include installation of fiber optic cable, fiber-optic cable equipment, fiber network switches (installation and programming), replacement of traffic signal vehicle heads and mounting, conduit, conductors, cables (removal, reinstallation, and replacement), traffic signal controllers, conflict monitors, fiber vaults, pull boxes, programming signal timing, and all appurtenant work and other items.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work include installation of fiber optic cable, fiber-optic cable equipment, fiber network switches (installation and programming), replacement of traffic signal vehicle heads and mounting, conduit, conductors, cables (removal, reinstallation, and replacement), traffic signal controllers, conflict monitors, fiber vaults, pull boxes, programming signal timing, and all appurtenant work and other items.
Posted Date
Nov 13, 2025
Due Date
Jan 15, 2026
Release: Nov 13, 2025
Close: Jan 15, 2026
Work include installation of fiber optic cable, fiber-optic cable equipment, fiber network switches (installation and programming), replacement of traffic signal vehicle heads and mounting, conduit, conductors, cables (removal, reinstallation, and replacement), traffic signal controllers, conflict monitors, fiber vaults, pull boxes, programming signal timing, and all appurtenant work and other items.
Premium
Access the largest public sector contact database
Construction of the water line loop.
Posted Date
Nov 25, 2025
Due Date
Dec 18, 2025
Release: Nov 25, 2025
Close: Dec 18, 2025
Construction of the water line loop.
AvailableQualified contractors for the Fiber Phase 2 Construction Project. The work under this project generally consists of building the necessary components to create the high-speed Fiber-To-The-Premise (FTTP) Optical Network (XGS-PON) communications Network (the Project) within the City’s defined service area and preparing it to deliver fiber-to-home services. The system shall be a fully operations high-speed communications network supporting Internet protocol technology and allowing users access to and from the Internet.
Posted Date
Nov 6, 2025
Due Date
Dec 16, 2025
Release: Nov 6, 2025
Close: Dec 16, 2025
Qualified contractors for the Fiber Phase 2 Construction Project. The work under this project generally consists of building the necessary components to create the high-speed Fiber-To-The-Premise (FTTP) Optical Network (XGS-PON) communications Network (the Project) within the City’s defined service area and preparing it to deliver fiber-to-home services. The system shall be a fully operations high-speed communications network supporting Internet protocol technology and allowing users access to and from the Internet.
AvailableRelease: Dec 4, 2025
Close: Dec 19, 2025
Provide fiber extension project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis