CityNV
Posted
Oct 2, 2026
Oct 16, 2026
Central Ely Sewer Upgrade Project
Work includes sewer upgrade.
Description: Work includes sewer upgrade.
City · NV, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
CityNV
Posted
Oct 2, 2026
Oct 16, 2026
Work includes sewer upgrade.
CityMN
Posted
Sep 29, 2026
Oct 27, 2026
The Work shall be completed under one Contract and consists of all labor, skill and materials required to properly construct the Project. The major elements of work associated with the project include, but are not limited to: Demolition of an existing 400 GPM self-priming centrifugal pump, process pipe, fittings, valves, and appurtenances located within the existing pump station; Installation of a new intake structure and intake screen with a capacity of up to 2,000 GPM and located within Burntside Lake; Installation of a new 16", DR11, HDPE gravity transmission pipeline from the new intake screen to the existing pump station located on shore (approx. length of 525 LF); Installation of various buried site ductile iron pipe, fittings, valves, and appurtenances to connect the new intake pipe to the pump station process piping; Installation of various ductile iron process pipe, fittings, valves, and appurtenances inside of the existing pump station to connect the new pump to the suction and discharge piping; Installation of a new vacuum prime assisted self-priming centrifugal raw water pump with a rated capacity of 1,000 GPM including a new variable frequency drive and a new simplex air compressor for the vacuum assist system; Various electrical improvements to provide power to the new raw water pump and appurtenances; Various structural improvements to accommodate installation of the new pump and appurtenances including converting an existing exterior single door to a new double door as well as concrete equipment pads for the new equipment; and Related site work, site grading, rip rap at the shoreline, seeding, and restoration work.
Special DistrictMA
Posted
Oct 1, 2026
Oct 23, 2026
Project consists of but not limited to add a vestibule within the community room at the existing rear entrance. Work includes new storefront in 3 openings including 2 power-operated entry doors; addition of hvac equipment for vestibule; expand and modify existing intercom, security, fire alarm, and access control systems including new nvr system; electrical work including interior and exterior lighting
Fredericksburg Sewer And Water Authority
Special DistrictPA
Posted
Aug 21, 2026
Oct 14, 2026
Contract No. 1 – Pipeline Construction: Construction of approx. 1,135 LF of 10", 6,570 LF of 8", and 876 LF of 6" PVC water mains, demolition or reconfiguration of water mains at multiple locations, disinfection of pipelines, and other incidental work as indicated in the Contract Documents. Contract No. 2 – General Construction: The work of this contract generally consists of the construction of a manganese filter building, rehabilitation of the existing office building and garage, physical installation of all process equipment, chemical feed equipment, sludge wasting equipment, water recycling equipment, backwash equipment, physical modifications at Well 6, equipment modifications at the water storage tanks, process piping, chemical spill drain piping, and other incidental work as indicated in the Contract Documents. Contract No. 3 – Electrical Construction: The work of this contract generally consists of furnishing and installing electrical power supply and distribution equipment, standby electrical power generation equipment, electrical conduits and wiring for all process and other powered equipment provided under all other contracts, electrical upgrade of Well 6, installation of well controls at new wells 7 & 8, electrical installation of a mixer in the West Water Tower, demolition of the electrical service to the existing mixers in both water towers, and other incidental work as indicated in the Contract Documents. Contract No. 4 – Plumbing Construction: The work of this contract generally consists of furnishing and installing domestic cold and hot water supply piping, fixtures, accessories, point-of-use water heaters, sanitary waste and vent piping, and other incidental work as indicated in the Contract Documents. Contract No. 5 – HVAC Construction: The work of this contract generally consists of furnishing and installing heating and ventilation equipment in the proposed filter and refurbished office buildings, including air conditioning and heating units, compressor, electric unit heaters, gas unit heaters, propane tank and piping, and other related incidental work as indicated in the Contract Documents.
Decision makers connected to this RFP from City of Ely.