Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Furnish and deliver a new substation transformer and/or two 138kv substation breakers, and/or one 138kv circuit switcher with integral disconnect switch. The Project includes the following equipment: Bid Group A: Furnish and deliver, including any necessary labor and materials needed to provide one new, 138 kV to 13.8 kV, 30/40/50 MVA transformers. This shall include offloading, assembly, oil top off and testing of the transformer by the manufacturer. and/or Bid Group B: Furnish and deliver, including any necessary labor and materials needed to provide two new, 138 kV gas insulated breakers for use in the Substation. and/or Bid Group C: Furnish and deliver, including any necessary labor and materials needed to provide one new, 138 kV gas insulated circuit switcher with integral disconnect switch, mounting pedestal and anchor bolts.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Substation panels for the central city substation.
Posted Date
Dec 2, 2025
Due Date
Dec 31, 2025
Release: Dec 2, 2025
Close: Dec 31, 2025
Substation panels for the central city substation.
The City of Taneytown seeks proposals for construction of the Memorial Drive Water Main Improvements, including replacement of 21 water services, replacement of 3 hydrants, installation of a new 6" water main, valves, connections, curb-to-curb pavement mill and overlay, and erosion & sediment control. A mandatory pre-bid conference and site visit is scheduled for 2026-01-07 at 10:00 AM. The solicitation is a Request for Proposal for construction work, open 2025-12-22 through 2026-01-23 and is not a grant program.
Posted Date
Dec 22, 2025
Due Date
Jan 23, 2026
Release: Dec 22, 2025
Close: Jan 23, 2026
The City of Taneytown seeks proposals for construction of the Memorial Drive Water Main Improvements, including replacement of 21 water services, replacement of 3 hydrants, installation of a new 6" water main, valves, connections, curb-to-curb pavement mill and overlay, and erosion & sediment control. A mandatory pre-bid conference and site visit is scheduled for 2026-01-07 at 10:00 AM. The solicitation is a Request for Proposal for construction work, open 2025-12-22 through 2026-01-23 and is not a grant program.
AvailableWork includes design, manufacture, testing, and delivery of the substation expansion - substation steel and equipment. The work for which bids are to be received consists of: design of substation steel structures, structure foundations, and substation ground grid. Providing all materials for the substation structures and ground grid. Providing all station insulators, switches, and bus work.
Posted Date
Nov 22, 2025
Due Date
Jan 8, 2026
Release: Nov 22, 2025
Close: Jan 8, 2026
Work includes design, manufacture, testing, and delivery of the substation expansion - substation steel and equipment. The work for which bids are to be received consists of: design of substation steel structures, structure foundations, and substation ground grid. Providing all materials for the substation structures and ground grid. Providing all station insulators, switches, and bus work.
Removing and replacing a damaged traffic signal pole. This project includes the following: The work consists of removing and replacing a damaged traffic signal pole at the intersection of Drive. The existing signal mast arm, signal heads, detection camera, preemption, streetlight arms and fixtures, signs and foundation will be reused. No onsite work to remove any of the components shall commence until the new traffic signal pole has been delivered. Setup proper, previously approved, traffic control to establish work area. Provide and maintain traffic control per the Virginia Work Area Protection Manual during all work activities. Carefully remove the existing mast arm, signal heads, detection camera, preemption, attached signage, streetlight arms and luminaires, and all associated wiring. Remove and dispose of the damaged traffic signal pole. Inspect and clean the existing foundation. Install the new traffic signal pole of the same height, finish (black powder-coated steel), and base-plate configuration to match the existing mast arm and foundation. Reinstall the existing mast arm, signal heads, detection camera, preemption, signage, streetlight arms and luminaires, on the new pole. New wiring shall be used from the signal pole terminal block to all equipment on the pole/mast arm. Reconnect all wiring or grounding as needed to ensure proper electrical operation for both the traffic signal and streetlight. Test and aim all signal heads and the streetlight to ensure correct operation and illumination pattern. Coordinate with City traffic signal staff for power shutdown and reactivation. Provide all labor, equipment, materials, and incidental items necessary for a complete and operational installation.
Posted Date
Nov 17, 2025
Due Date
Jan 6, 2026
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Release: Nov 17, 2025
Close: Jan 6, 2026
Removing and replacing a damaged traffic signal pole. This project includes the following: The work consists of removing and replacing a damaged traffic signal pole at the intersection of Drive. The existing signal mast arm, signal heads, detection camera, preemption, streetlight arms and fixtures, signs and foundation will be reused. No onsite work to remove any of the components shall commence until the new traffic signal pole has been delivered. Setup proper, previously approved, traffic control to establish work area. Provide and maintain traffic control per the Virginia Work Area Protection Manual during all work activities. Carefully remove the existing mast arm, signal heads, detection camera, preemption, attached signage, streetlight arms and luminaires, and all associated wiring. Remove and dispose of the damaged traffic signal pole. Inspect and clean the existing foundation. Install the new traffic signal pole of the same height, finish (black powder-coated steel), and base-plate configuration to match the existing mast arm and foundation. Reinstall the existing mast arm, signal heads, detection camera, preemption, signage, streetlight arms and luminaires, on the new pole. New wiring shall be used from the signal pole terminal block to all equipment on the pole/mast arm. Reconnect all wiring or grounding as needed to ensure proper electrical operation for both the traffic signal and streetlight. Test and aim all signal heads and the streetlight to ensure correct operation and illumination pattern. Coordinate with City traffic signal staff for power shutdown and reactivation. Provide all labor, equipment, materials, and incidental items necessary for a complete and operational installation.
Available