Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Celina is soliciting bids to construct a new 900 GPM water well, associated discharge assembly, and related infrastructure at the Celina Road Pump Station site, including an electrical building, yard piping, HVAC, and SCADA integration. The project has an estimated budget of approximately $6.2 million and a period of performance of 330 calendar days from notice to proceed. The City requests electronic bid submission and requires bid, performance, payment, and maintenance bonds per the solicitation.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide chena relief wells pump.
Posted Date
Jan 9, 2026
Due Date
Jan 29, 2026
Release: Jan 9, 2026
Close: Jan 29, 2026
Provide chena relief wells pump.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work related to the stormwater pump station includes installing new stormwater pumps, influent manholes, wetwell, additional manholes, platform, gravity storm drain, outfall, and other site improvements and civil work. Work related to the wastewater pump station includes installing new wastewater pumps, influent manhole, wetwell, valve vault, flow meter vault, new force main and other site improvements and civil work. It is anticipated stormwater pump station work to occur first and the wastewater pump station to follow
Posted Date
Dec 18, 2025
Due Date
Feb 2, 2026
Release: Dec 18, 2025
Close: Feb 2, 2026
Work related to the stormwater pump station includes installing new stormwater pumps, influent manholes, wetwell, additional manholes, platform, gravity storm drain, outfall, and other site improvements and civil work. Work related to the wastewater pump station includes installing new wastewater pumps, influent manhole, wetwell, valve vault, flow meter vault, new force main and other site improvements and civil work. It is anticipated stormwater pump station work to occur first and the wastewater pump station to follow
AvailableWork includes construction of a new stormwater pump station to replace the existing wetwell within the pump station, installing a new wetwell with submersible pumps and a controls building, new trash rack, piles, along with mechanical, electrical, and civil work, including installation of owner supplied equipment.
Posted Date
Jan 8, 2026
Due Date
Jan 29, 2026
Release: Jan 8, 2026
Close: Jan 29, 2026
Work includes construction of a new stormwater pump station to replace the existing wetwell within the pump station, installing a new wetwell with submersible pumps and a controls building, new trash rack, piles, along with mechanical, electrical, and civil work, including installation of owner supplied equipment.
AvailableThe scope of work generally consists of the complete demolition and replacement of wastewater pump station. The new pump station will provide a wet well sized to reduce pump cycling, and the new building will be cmu with brick face and will include a standing seam metal roof.
Posted Date
Jan 20, 2026
Due Date
Feb 20, 2026
Release: Jan 20, 2026
Close: Feb 20, 2026
The scope of work generally consists of the complete demolition and replacement of wastewater pump station. The new pump station will provide a wet well sized to reduce pump cycling, and the new building will be cmu with brick face and will include a standing seam metal roof.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.