Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Reconstruction of the base and paving on top of the new base. Two lanes will be constructed, each being 9' wide with 2' wide sodded shoulders on each side. Thermoplastic striping and installation of raised pavement markers are included as well as updating all necessary signage.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of Donalsonville (Seminole County, GA) is soliciting bids for construction of Flooding, Street, & Drainage System Improvements to serve the Highland Neighborhood under CDBG-MIT funding. The work includes grading roadside ditches, installing storm and driveway piping, constructing outfall ditches, resurfacing roadways, lowering existing water and gas main services, erosion and sediment control, and all associated measures; performance is roughly 180 days to substantial completion and 194 days total for close-out. Bidders must be licensed in Georgia, submit a bid bond of at least 10% of the bid, and provide 100% performance and payment bonds; the posting links to the Georgia procurement registry and lists a response deadline of 2026-01-29.
Posted Date
Dec 17, 2025
Due Date
Jan 29, 2026
Release: Dec 17, 2025
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Jan 29, 2026
The City of Donalsonville (Seminole County, GA) is soliciting bids for construction of Flooding, Street, & Drainage System Improvements to serve the Highland Neighborhood under CDBG-MIT funding. The work includes grading roadside ditches, installing storm and driveway piping, constructing outfall ditches, resurfacing roadways, lowering existing water and gas main services, erosion and sediment control, and all associated measures; performance is roughly 180 days to substantial completion and 194 days total for close-out. Bidders must be licensed in Georgia, submit a bid bond of at least 10% of the bid, and provide 100% performance and payment bonds; the posting links to the Georgia procurement registry and lists a response deadline of 2026-01-29.
AvailableProcurement of drainage repair services for Bolton's Branch Drainage Improvements.
Posted Date
Dec 17, 2025
Due Date
Jan 14, 2026
Release: Dec 17, 2025
Close: Jan 14, 2026
Procurement of drainage repair services for Bolton's Branch Drainage Improvements.
AvailableRelease: Dec 16, 2025
Close: Jan 20, 2026
Work includes drainage improvements.
AvailableThe County of Wayne requests engineering services to support a 2021 CDBG-NR project that includes demolition and reconstruction of 2 housing units, rehabilitation of 4 housing units, and storm drainage improvements within the designated project area. The selected firm will provide final design, prepare construction bid packages, perform surveying, supervise bidding and construction administration, review payment requests/change orders, perform inspections, and provide closeout documents; drainage work includes ~475 LF of pipe and ~375 LF of ditch restoration with a drainage budget of $165,000 and total project funding of $750,000. Period of performance is approximately 10 months from award; the solicitation is open with a response deadline of 2026-01-22.
Posted Date
Dec 30, 2025
Due Date
Jan 22, 2026
Release: Dec 30, 2025
Close: Jan 22, 2026
The County of Wayne requests engineering services to support a 2021 CDBG-NR project that includes demolition and reconstruction of 2 housing units, rehabilitation of 4 housing units, and storm drainage improvements within the designated project area. The selected firm will provide final design, prepare construction bid packages, perform surveying, supervise bidding and construction administration, review payment requests/change orders, perform inspections, and provide closeout documents; drainage work includes ~475 LF of pipe and ~375 LF of ditch restoration with a drainage budget of $165,000 and total project funding of $750,000. Period of performance is approximately 10 months from award; the solicitation is open with a response deadline of 2026-01-22.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →