Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Detroit is seeking licensed plumbers to inspect, rehabilitate, and replace alley and private sewer services as part of the CDBG-DR recovery program. The project anticipates approximately 9,000 private sewer service line replacements over a four-year contract period. Services include CCTV inspections, point repairs, and site restoration across various locations in Detroit.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Housing rehabilitation/demolition-replacement program.
Posted Date
Jan 14, 2026
Due Date
Feb 17, 2026
Release: Jan 14, 2026
Close: Feb 17, 2026
Housing rehabilitation/demolition-replacement program.
AvailableProject includes rehabilitation of sanitary interceptor and collector sewers (point repairs). Point repairs include but are not limited to pipe installation and repairs, manhole replacement and rehabilitation, service connection repairs, pavement removal and replacement, backfilling and other miscellaneous related work.
Posted Date
Jan 13, 2026
Due Date
Feb 12, 2026
Release: Jan 13, 2026
Close: Feb 12, 2026
Project includes rehabilitation of sanitary interceptor and collector sewers (point repairs). Point repairs include but are not limited to pipe installation and repairs, manhole replacement and rehabilitation, service connection repairs, pavement removal and replacement, backfilling and other miscellaneous related work.
AvailableWork includes rehabilitation of three (3) streets, the installation of new sanitary sewer mains, and storm drain improvements, rehabilitation shall include, but is not limited to, the removal and replacement of pavement section, driveways, curb and gutter, sanitary sewer manholes and pipe, select storm drain structures and pipe, dewatering, landscaping, pavement striping and signage, provisions for traffic control.
Posted Date
Jan 29, 2026
Due Date
Feb 19, 2026
Release: Jan 29, 2026
Close: Feb 19, 2026
Work includes rehabilitation of three (3) streets, the installation of new sanitary sewer mains, and storm drain improvements, rehabilitation shall include, but is not limited to, the removal and replacement of pavement section, driveways, curb and gutter, sanitary sewer manholes and pipe, select storm drain structures and pipe, dewatering, landscaping, pavement striping and signage, provisions for traffic control.
Work includes 1,459 LF 6-inch pipe bursting; 2,681 LF 8 "pipe bursting; 300 LF additional open cut in pipe bursting locations (revocable); 90 LF 6" open trench; 3,731 LF abandon sanitary sewer main; 3 EA replace lower lateral at sewer main open trench location;7 EA manhole rehabilitation; 20 EA modify manhole for pipe bursting; 2 EA remove and replace sewer manhole; 17 EA install new standard sewer manhole; 1 EA install new 24" sewer manhole; 14,833 SY 2" grind and overlay; 131 LF white stop bar pavement marking; 182 LF crosswalk striping (ladder); 50 CY hard rock excavation (revocable); 400 LF concrete curb and gutter replacement; 200 SY concrete sidewalk replacement.
Posted Date
Jan 12, 2026
Due Date
Feb 4, 2026
Release: Jan 12, 2026
Close: Feb 4, 2026
Work includes 1,459 LF 6-inch pipe bursting; 2,681 LF 8 "pipe bursting; 300 LF additional open cut in pipe bursting locations (revocable); 90 LF 6" open trench; 3,731 LF abandon sanitary sewer main; 3 EA replace lower lateral at sewer main open trench location;7 EA manhole rehabilitation; 20 EA modify manhole for pipe bursting; 2 EA remove and replace sewer manhole; 17 EA install new standard sewer manhole; 1 EA install new 24" sewer manhole; 14,833 SY 2" grind and overlay; 131 LF white stop bar pavement marking; 182 LF crosswalk striping (ladder); 50 CY hard rock excavation (revocable); 400 LF concrete curb and gutter replacement; 200 SY concrete sidewalk replacement.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.