Posted
Nov 18, 2026
Nov 30, 2026
H199--FY27 Cathodic Protection Inspection and Testing RFP
The Contractor shall perform annual inspecting, testing and evaluation of the existing galvanic cathodic protection (CP) system serving the underground coated steel steam and condensate pipelines at the Orlando VA Medical Center, Lake Nona Campus. The purpose of this testing is to verify continued compliance with NACE cathodic protection criteria, ensure electrical isolation integrity, check anode performance, and document all monitoring results in a comprehensive annual report. Annual testing responsibilities include: Locating and inspecting all accessible CP test stations (up to 24). Measuring “ON” potentials for steam and condensate lines using calibrated instruments. Measuring anode current output across each calibrated shunt. See attached file.
