CityGA
Posted
Aug 6, 2026
Sep 8, 2026
Conduit & Wire Installation Phase 4 - Invitation for Bid
Work includes to install 1-2 inch HDPE primary power conduit between transformers via directional bore method as shown on provided drawings at a minimum depth of 3.5 ft.