Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes approx 5,600 LF 6" PVC Class 305/DR14 or Class 350 DIP water line; 11,400 LF 1 1/2" milling and overlay; 1 LS erosion and sediment control. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide 2022 Water Line Replacement Project Contract No. 1 – Water System Improvements.2022 Water Line Replacement Project Contract No. 1 – Water System Improvements
Posted Date
Dec 8, 2025
Due Date
Jan 6, 2026
Release: Dec 8, 2025
Close: Jan 6, 2026
Provide 2022 Water Line Replacement Project Contract No. 1 – Water System Improvements.2022 Water Line Replacement Project Contract No. 1 – Water System Improvements
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes approx 10,231 LF of 8" PVC C900 DR18 water line pipe; 126 LF of 12" waterline bore without casing; 20 EA 12" gate valve awwa 509; 681 SY driveway repair (concrete). See outside link.
Posted Date
Dec 3, 2025
Due Date
Jan 13, 2026
Release: Dec 3, 2025
Close: Jan 13, 2026
Work includes approx 10,231 LF of 8" PVC C900 DR18 water line pipe; 126 LF of 12" waterline bore without casing; 20 EA 12" gate valve awwa 509; 681 SY driveway repair (concrete). See outside link.
AvailableProject consists of sewer line replacement.
Posted Date
Dec 12, 2025
Due Date
Jan 13, 2026
Release: Dec 12, 2025
Close: Jan 13, 2026
Project consists of sewer line replacement.
AvailableWork includes replacement of lead and galvanized water service lines throughout the city. The work includes new connections to existing water mains, new curb stops, and replacement of meter pits, and service line to interior home shut-off valves. Other work includes ancillary surface restoration, utility coordination, and all other work required for the completion of the project.
Posted Date
Dec 18, 2025
Due Date
Jan 12, 2026
Release: Dec 18, 2025
Close: Jan 12, 2026
Work includes replacement of lead and galvanized water service lines throughout the city. The work includes new connections to existing water mains, new curb stops, and replacement of meter pits, and service line to interior home shut-off valves. Other work includes ancillary surface restoration, utility coordination, and all other work required for the completion of the project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →