Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 2,350 LF 8" HDPE sdr11 water pipe (linear foot); 3,380 LF 6" HDPE sdr11 water pipe (linear foot); 30 LF 24" DIPJ zinc pipe cl 52 (linear foot); 30 LF 6" dipj zinc pipe cl 52 (linear foot); 3 EA furnish and install air relief, 8" gate valve and vault (each); 2 EA furnish and install air relief, 6" gate valve and vault (each); 2 EA furnish and install adjustable valve box and 8" gate valve (each); 8 EA furnish and install adjustable valve box and 6" gate valve (each); 1 EA furnish and install tee, pipe, fittings, valve, adjustable valve box, and hydrant;; 1 EA type 1 hydrant per mud construction standard 3.0.1, (standard) (each); 6 EA furnish and install tee, pipe, bends, swivels, fittings as needed, valve, adjustable valve box, and hydrant. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes 8" HDPE SDR11 water pipe (lf) 3660, 6" HDPE SDR11 Water Pipe 3580 (lf), 12" DIPJ zinc pipe CL 52 20 lf, bypass piping 1 ls, furnish and install air relief, 8" gate valve and vault 4 (ea), air relief, 6" gate valve and vault 1 (each), furnish and install 8" gate valve and vault (ea) 1 ea, furnish and install 8" gate valve and vault (ea). see outside link.
Posted Date
-
Due Date
Feb 10, 2026
Close: Feb 10, 2026
Work includes 8" HDPE SDR11 water pipe (lf) 3660, 6" HDPE SDR11 Water Pipe 3580 (lf), 12" DIPJ zinc pipe CL 52 20 lf, bypass piping 1 ls, furnish and install air relief, 8" gate valve and vault 4 (ea), air relief, 6" gate valve and vault 1 (each), furnish and install 8" gate valve and vault (ea) 1 ea, furnish and install 8" gate valve and vault (ea). see outside link.
AvailableWork includes replacement of approximately 2,900' of existing water main by trenching.
Posted Date
Jan 8, 2026
Due Date
Jan 29, 2026
Release: Jan 8, 2026
Close: Jan 29, 2026
Work includes replacement of approximately 2,900' of existing water main by trenching.
AvailableWork includes replacing the existing six-inch cast iron water main with new 12" ductile iron pipe water main. Water services and hydrants will be constructed as part of the water main replacements.
Posted Date
-
Due Date
Feb 5, 2026
Close: Feb 5, 2026
Work includes replacing the existing six-inch cast iron water main with new 12" ductile iron pipe water main. Water services and hydrants will be constructed as part of the water main replacements.
AvailableInstallation of over 600 LF of 6" diameter Class 50 ductile iron water main complete with the installation of new gate valves, permanent blow off assembly and all required fittings, bends, tees, and appurtenances. Work also includes the installation of a fire hydrant assembly, reconnection of five water services with pressure reducing valves, the abandonment of existing water main in-place, the installation, maintenance, and removal of temporary traffic control and erosion control measures, tree removal, rock excavation, and the removal and replacement of existing fences, landscaping, and gravel surfaces.
Posted Date
Dec 31, 2025
Due Date
Jan 27, 2026
Release: Dec 31, 2025
Close: Jan 27, 2026
Installation of over 600 LF of 6" diameter Class 50 ductile iron water main complete with the installation of new gate valves, permanent blow off assembly and all required fittings, bends, tees, and appurtenances. Work also includes the installation of a fire hydrant assembly, reconnection of five water services with pressure reducing valves, the abandonment of existing water main in-place, the installation, maintenance, and removal of temporary traffic control and erosion control measures, tree removal, rock excavation, and the removal and replacement of existing fences, landscaping, and gravel surfaces.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis