Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This project involves replacing existing six-inch cast iron water main with new 12-inch ductile iron pipe water main, including construction of water services and hydrants.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Approx., 1,600 LF of 8" ductile iron water main replacement and about 75 LF of 10" HDPE water main boring. Additionally, service reconnections, hydrant installation, surfacing repair, and related work.
Posted Date
Dec 12, 2025
Due Date
Jan 15, 2026
Release: Dec 12, 2025
Close: Jan 15, 2026
Approx., 1,600 LF of 8" ductile iron water main replacement and about 75 LF of 10" HDPE water main boring. Additionally, service reconnections, hydrant installation, surfacing repair, and related work.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement of services for the North Avenue - Bancroft to Higgins Water Main Replacement Project, including the installation of water mains, services, associated fittings, fire hydrants, and restoration work.
Posted Date
Dec 13, 2025
Due Date
Jan 14, 2026
Release: Dec 13, 2025
Close: Jan 14, 2026
Procurement of services for the North Avenue - Bancroft to Higgins Water Main Replacement Project, including the installation of water mains, services, associated fittings, fire hydrants, and restoration work.
AvailableWater Main Replacement, includes replacing water mains downstream of the new 1 MG water storage tank. The Water Main Replacement
Posted Date
Dec 14, 2025
Due Date
Jan 28, 2026
Release: Dec 14, 2025
Close: Jan 28, 2026
Water Main Replacement, includes replacing water mains downstream of the new 1 MG water storage tank. The Water Main Replacement
AvailableThe project generally consists of the replacement of approx. 1,700 ft of a combination of 4IN, 6IN and 8IN ductile iron watermain and 51 water services. Work consists of: 16 LF, remove and replace concrete curb; 434 SY, subgrade compaction (main trench = 2' trench width, 4' pavement cut width); 295 LF, furnish & install 4" polywrapped c151 pressure class 52 ductile iron restrained and un-restrained watermain, including push-on joints, restrained joints, fittings; 980 LF, furnish & install 6" polywrapped c151 pressure class 52 ductile iron estrained and un-restrained watermain, including push-on joints, restrained joints, fittings; 250 SY, site restoration, including grading, seeding, mulching. See attached files.
Posted Date
-
Due Date
Jan 22, 2026
Close: Jan 22, 2026
The project generally consists of the replacement of approx. 1,700 ft of a combination of 4IN, 6IN and 8IN ductile iron watermain and 51 water services. Work consists of: 16 LF, remove and replace concrete curb; 434 SY, subgrade compaction (main trench = 2' trench width, 4' pavement cut width); 295 LF, furnish & install 4" polywrapped c151 pressure class 52 ductile iron restrained and un-restrained watermain, including push-on joints, restrained joints, fittings; 980 LF, furnish & install 6" polywrapped c151 pressure class 52 ductile iron estrained and un-restrained watermain, including push-on joints, restrained joints, fittings; 250 SY, site restoration, including grading, seeding, mulching. See attached files.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →