Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes replacement of approximately 2,900' of existing water main by trenching.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes 2,350 LF 8" HDPE sdr11 water pipe (linear foot); 3,380 LF 6" HDPE sdr11 water pipe (linear foot); 30 LF 24" DIPJ zinc pipe cl 52 (linear foot); 30 LF 6" dipj zinc pipe cl 52 (linear foot); 3 EA furnish and install air relief, 8" gate valve and vault (each); 2 EA furnish and install air relief, 6" gate valve and vault (each); 2 EA furnish and install adjustable valve box and 8" gate valve (each); 8 EA furnish and install adjustable valve box and 6" gate valve (each); 1 EA furnish and install tee, pipe, fittings, valve, adjustable valve box, and hydrant;; 1 EA type 1 hydrant per mud construction standard 3.0.1, (standard) (each); 6 EA furnish and install tee, pipe, bends, swivels, fittings as needed, valve, adjustable valve box, and hydrant. See outside link.
Posted Date
Jan 21, 2026
Due Date
Feb 10, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Feb 10, 2026
Work includes 2,350 LF 8" HDPE sdr11 water pipe (linear foot); 3,380 LF 6" HDPE sdr11 water pipe (linear foot); 30 LF 24" DIPJ zinc pipe cl 52 (linear foot); 30 LF 6" dipj zinc pipe cl 52 (linear foot); 3 EA furnish and install air relief, 8" gate valve and vault (each); 2 EA furnish and install air relief, 6" gate valve and vault (each); 2 EA furnish and install adjustable valve box and 8" gate valve (each); 8 EA furnish and install adjustable valve box and 6" gate valve (each); 1 EA furnish and install tee, pipe, fittings, valve, adjustable valve box, and hydrant;; 1 EA type 1 hydrant per mud construction standard 3.0.1, (standard) (each); 6 EA furnish and install tee, pipe, bends, swivels, fittings as needed, valve, adjustable valve box, and hydrant. See outside link.
AvailableThe City of Roseville is soliciting proposals for a design-assist and construction contract to replace approximately 400 feet of 24-inch water transmission main on Cirby Way, including installation of 8-inch lateral connections and related appurtenances (valves, blow-offs, cathodic protection, and test stations). The selected contractor will collaborate with the Citys Engineering Design Consultant during final design and provide all labor, materials, equipment, and appurtenances per the Contract Documents. The solicitation estimates a project value between $1,000,000 and $3,000,000 and is open for proposals.
Posted Date
Jan 8, 2026
Due Date
Mar 9, 2026
Release: Jan 8, 2026
Close: Mar 9, 2026
The City of Roseville is soliciting proposals for a design-assist and construction contract to replace approximately 400 feet of 24-inch water transmission main on Cirby Way, including installation of 8-inch lateral connections and related appurtenances (valves, blow-offs, cathodic protection, and test stations). The selected contractor will collaborate with the Citys Engineering Design Consultant during final design and provide all labor, materials, equipment, and appurtenances per the Contract Documents. The solicitation estimates a project value between $1,000,000 and $3,000,000 and is open for proposals.
AvailableWater Main Replacement, includes replacing water mains downstream of the new 1 MG water storage tank. The Water Main Replacement
Posted Date
Dec 14, 2025
Due Date
Jan 28, 2026
Release: Dec 14, 2025
Close: Jan 28, 2026
Water Main Replacement, includes replacing water mains downstream of the new 1 MG water storage tank. The Water Main Replacement
AvailableReplacement of roof, decking, underlayment at our Main office.
Posted Date
Dec 4, 2025
Due Date
Feb 6, 2026
Release: Dec 4, 2025
Close: Feb 6, 2026
Replacement of roof, decking, underlayment at our Main office.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.