Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 8" HDPE SDR11 water pipe (lf) 3660, 6" HDPE SDR11 Water Pipe 3580 (lf), 12" DIPJ zinc pipe CL 52 20 lf, bypass piping 1 ls, furnish and install air relief, 8" gate valve and vault 4 (ea), air relief, 6" gate valve and vault 1 (each), furnish and install 8" gate valve and vault (ea) 1 ea, furnish and install 8" gate valve and vault (ea). see outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This Invitation for Bid is for the replacement of a waterline along 400 N Main St to 200 W.
Posted Date
-
Due Date
Feb 19, 2026
Close: Feb 19, 2026
This Invitation for Bid is for the replacement of a waterline along 400 N Main St to 200 W.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 2,350 LF 8" HDPE sdr11 water pipe (linear foot); 3,380 LF 6" HDPE sdr11 water pipe (linear foot); 30 LF 24" DIPJ zinc pipe cl 52 (linear foot); 30 LF 6" dipj zinc pipe cl 52 (linear foot); 3 EA furnish and install air relief, 8" gate valve and vault (each); 2 EA furnish and install air relief, 6" gate valve and vault (each); 2 EA furnish and install adjustable valve box and 8" gate valve (each); 8 EA furnish and install adjustable valve box and 6" gate valve (each); 1 EA furnish and install tee, pipe, fittings, valve, adjustable valve box, and hydrant;; 1 EA type 1 hydrant per mud construction standard 3.0.1, (standard) (each); 6 EA furnish and install tee, pipe, bends, swivels, fittings as needed, valve, adjustable valve box, and hydrant. See outside link.
Posted Date
Jan 21, 2026
Due Date
Feb 10, 2026
Release: Jan 21, 2026
Close: Feb 10, 2026
Work includes 2,350 LF 8" HDPE sdr11 water pipe (linear foot); 3,380 LF 6" HDPE sdr11 water pipe (linear foot); 30 LF 24" DIPJ zinc pipe cl 52 (linear foot); 30 LF 6" dipj zinc pipe cl 52 (linear foot); 3 EA furnish and install air relief, 8" gate valve and vault (each); 2 EA furnish and install air relief, 6" gate valve and vault (each); 2 EA furnish and install adjustable valve box and 8" gate valve (each); 8 EA furnish and install adjustable valve box and 6" gate valve (each); 1 EA furnish and install tee, pipe, fittings, valve, adjustable valve box, and hydrant;; 1 EA type 1 hydrant per mud construction standard 3.0.1, (standard) (each); 6 EA furnish and install tee, pipe, bends, swivels, fittings as needed, valve, adjustable valve box, and hydrant. See outside link.
AvailableWork includes replacing the existing six-inch cast iron water main with new 12" ductile iron pipe water main. Water services and hydrants will be constructed as part of the water main replacements.
Posted Date
-
Due Date
Feb 5, 2026
Close: Feb 5, 2026
Work includes replacing the existing six-inch cast iron water main with new 12" ductile iron pipe water main. Water services and hydrants will be constructed as part of the water main replacements.
AvailableWork consists of n. Dustin 8" waterline replacement. Work includes replace 1,680 lf of the aging 8" asbestos cement water main with new 8" pvc pipe.
Posted Date
Dec 22, 2025
Due Date
Feb 11, 2026
Release: Dec 22, 2025
Close: Feb 11, 2026
Work consists of n. Dustin 8" waterline replacement. Work includes replace 1,680 lf of the aging 8" asbestos cement water main with new 8" pvc pipe.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →