CountyFL
Jul 26, 2026
Closes
Aug 27, 2026
Angeline, Phase 6B Site Development Improvements (Request for Proposals)
Work includes phase 6b site development improvements.
Description: Carousel House site & Building Improvements project. The project includes an adaptive re-use and renovation of the existing Carousel House building, in additional to two new additions for the new natatorium and gymnasium. Interior renovations will include ADA accessibility updates, a new gathering area, a 2-court gym, a lap pool & activity pool, an art & ceramics room, a fitness room, 2 multi-purpose rooms, a computer room, state of the art MEP systems, new finishes, and restrooms. Exterior improvements include an expanded parking lot, new playground, loading and bus drop-off area, site fencing, and new landscaping.
SpecialDistrict · PA, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
CountyFL
Jul 26, 2026
Closes
Aug 27, 2026
Work includes phase 6b site development improvements.
CityPA
Jul 29, 2026
Closes
Aug 21, 2026
This RFP seeks proposals from qualified contractors to construct site improvements at the Natrona Launch Site, including a parking lot, ADA compliant pedestrian crossings, and scour repairs.
Coraopolis Water And Sewer Authority
Special DistrictPA
Jul 30, 2026
Closes
Aug 17, 2026
Work includes complete, start-up and place in successful operation of three (3) potable water mixer systems designed for operation in the existing approx 0. 7 mg fleming street tank, 0. 75 mg cemetery tank, and 1. 0 mg school street tank and all necessary appurtenances and restoration for said construction.
CityGA
Aug 3, 2026
Closes
Sep 17, 2026
Construction of gravity sanitary sewer and sanitary sewer force mains; manholes, valves, and trenchless crossings; grading and site work; access drives; site utilities (both public and private); instrumentation and controls; electrical systems; fencing; installation of a JIB crane; construction of a new electrical building; installation of a diesel-fired emergency bypass pump; erosion and sedimentation control measures; and final site restoration and grading. The total length of new sewer infrastructure included in the Project is approx. 4,360 LF, consisting of approx. 2,860 LF of 12", 10", and 8" gravity sanitary sewer and approx. 1,500 LF of 8" sanitary sewer force main, including associated manholes, fittings, appurtenances, and system connections.