Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Philadelphia Redevelopment Authority
The project includes a range of ADA accessibility updates, interior and exterior renovation, and energy efficient upgrades. Accessibility updates include new handicapped accessible entry ramp, interior elevator, and ADA compliant restrooms. Additionally, the project includes modifications to interior layouts, customized for McPherson Branch Library collections and daily programming including new furniture, appliances, and finishes. Supporting the requirement to achieve LEED Gold designation, upgrades include new thermal- efficient windows and doors and LED lighting throughout in addition to building performance upgrades to mechanical, electrical, plumbing, fire alarm, and security systems. Improvements at the exterior include restoration of the stucco exterior and façade details, repointing masonry elements within the park, the addition of a secondary egress stair from the lower level, new fence protection around the parking lot and existing basement stair, and improvements to existing stormwater management. Improvements to areas of the property that are used by the community include enhanced safety of park spaces, improved landscape, and new equipment for the playground.
Posted Date
Apr 29, 2026
Due Date
Jun 3, 2026
Release: Apr 29, 2026
Philadelphia Redevelopment Authority
Close: Jun 3, 2026
The project includes a range of ADA accessibility updates, interior and exterior renovation, and energy efficient upgrades. Accessibility updates include new handicapped accessible entry ramp, interior elevator, and ADA compliant restrooms. Additionally, the project includes modifications to interior layouts, customized for McPherson Branch Library collections and daily programming including new furniture, appliances, and finishes. Supporting the requirement to achieve LEED Gold designation, upgrades include new thermal- efficient windows and doors and LED lighting throughout in addition to building performance upgrades to mechanical, electrical, plumbing, fire alarm, and security systems. Improvements at the exterior include restoration of the stucco exterior and façade details, repointing masonry elements within the park, the addition of a secondary egress stair from the lower level, new fence protection around the parking lot and existing basement stair, and improvements to existing stormwater management. Improvements to areas of the property that are used by the community include enhanced safety of park spaces, improved landscape, and new equipment for the playground.
AvailablePhiladelphia Redevelopment Authority
The construction of the new playground with modification to the site. The work consists to selective demolition, concrete work, planting, grading, paving, playground equipment installation at the site location Lemon Hill Park.
Posted Date
Apr 28, 2026
Due Date
Jun 4, 2026
Release: Apr 28, 2026
Philadelphia Redevelopment Authority
Close: Jun 4, 2026
The construction of the new playground with modification to the site. The work consists to selective demolition, concrete work, planting, grading, paving, playground equipment installation at the site location Lemon Hill Park.
AvailablePhiladelphia Redevelopment Authority
The services in the Contract will include: grass mowing, trimming, and edging. maintaining ‘No Hunting’ signs, proper removal/disposal of lawn litter, including trash, and landscape debris such as leaves, sticks, grass clippings, and organic debris by the contractor (the "Services"). respond to dumping calls within 24-48hrs.
Posted Date
Jan 28, 2026
Due Date
Mar 3, 2026
Release: Jan 28, 2026
Philadelphia Redevelopment Authority
Close: Mar 3, 2026
The services in the Contract will include: grass mowing, trimming, and edging. maintaining ‘No Hunting’ signs, proper removal/disposal of lawn litter, including trash, and landscape debris such as leaves, sticks, grass clippings, and organic debris by the contractor (the "Services"). respond to dumping calls within 24-48hrs.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge