Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 3,615 SY selective demolition; 1 LS surveying and field engineering; 150 LF crack repair (healer/sealer); 250 SF horizontal partial depth patch; 3,615 SY cast in place concrete; 16 LF expansion joints; 1,000 LF crack repair (rout and seal); 2,200 LF rout and seal control joint in composite deck; 2,200 LF full depth joint (form and seal); 3 ea drain grate replacement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes slab replacement and slab sawing.
Posted Date
Jan 21, 2026
Due Date
Feb 5, 2026
Release: Jan 21, 2026
Close: Feb 5, 2026
Work includes slab replacement and slab sawing.
AvailableRelease: Jan 8, 2026
Close: Jan 27, 2026
Concrete slab replacement.
AvailableWork includes approx. 3,386 SY of concrete (7" thick) will be replaced. These will include 7" thick selected slab replacement on streets in the city. Includes saw cuts are required prior to the start of slab removals at locations marked in the field; break up, remove and properly dispose of existing concrete slabs; see outside link.
Posted Date
Jan 5, 2026
Due Date
Jan 27, 2026
Release: Jan 5, 2026
Close: Jan 27, 2026
Work includes approx. 3,386 SY of concrete (7" thick) will be replaced. These will include 7" thick selected slab replacement on streets in the city. Includes saw cuts are required prior to the start of slab removals at locations marked in the field; break up, remove and properly dispose of existing concrete slabs; see outside link.
AvailableRequest for bids for a concrete slab replacement project at Westport Park.
Posted Date
-
Due Date
Jan 27, 2026
Close: Jan 27, 2026
Request for bids for a concrete slab replacement project at Westport Park.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis