Greater Orlando Aviation Authority
Special DistrictFL
Posted
Nov 8, 2026
Dec 8, 2026
Roadway Signage & Infrastructure Phase 4 RFP
Work includes 250 LF guardrail - roadway, general tl-3 [*]; 2 EA guardrail end treatment- parallel approach terminal [*]; 1 EA sign panel, f&i, overhead mount, 201-300 SF with lighting [*]; 2 EA sign panel, f&i, overhead mount, 401-500 SF with lighting [*]; 4 EA sign panel, remove, 101-200 SF with lighting [*]; 2 sign panel, remove panel, 201-300 SF with lighting [*]; 1 EA sign panel, remove panel, 301-400 SF with lighting [*]; 2 EA overhead static sign structure, shallow foundation removal (4'), monotube [*]; 6 EA thermoplastic, preformed, multi colour route shield [*]. See attached file.
