Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide campus hydronic water treatment.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide chemical water treatment services.
Posted Date
Dec 5, 2025
Due Date
Jan 22, 2026
Release: Dec 5, 2025
Close: Jan 22, 2026
Provide chemical water treatment services.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Seeks proposals to finalize an agreement for HVAC water treatment services for the property management, water, and public events departments on an ongoing basis.
Posted Date
Dec 17, 2025
Due Date
Feb 5, 2026
Release: Dec 17, 2025
Close: Feb 5, 2026
Seeks proposals to finalize an agreement for HVAC water treatment services for the property management, water, and public events departments on an ongoing basis.
AvailableProvide professional engineering services in support of updating the district's water treatment and transmission system master plan.
Posted Date
Oct 28, 2025
Due Date
Jan 29, 2026
Release: Oct 28, 2025
Close: Jan 29, 2026
Provide professional engineering services in support of updating the district's water treatment and transmission system master plan.
AvailableThe Project includes the following Work: Division A: Water Treatment Plant Campus Division A includes a new 1,800 gallon per minute filtration and Per- and Polyfluoroalkyl (PFAS) removal water treatment plant with related site improvements and accessories; associated pumps, piping, valves, structures, electrical work and appurtenances. Electrical work includes outside conduits, feeders, and light poles. Division B: Ground Storage Tanks Division B includes two (2) one million gallons (1,000,000 gallons) ground storage tanks. Work includes site grading, earthwork, foundation, steel erection, and coating. Foundation/concrete work to include valve vault, valve(s), and piping extend outside of the vault or foundation shall be included. Electrical conduits, conductors, and pressure sensors are not included in the contract. Division C: Underground Piping Division C includes all underground water main, water services, sanitary sewer, and storm sewer within 5' of the building/structure or foundation. In addition to the water main, all manhole structures (excluding the head tank) shall be included. Fire hydrants to flush the head tank shall be included in Division C work. This work includes the conversion of the raw water main to finish water main. This will require multiple mobilization to connect, disconnect, tap and plug the water mains.
Posted Date
Nov 19, 2025
Due Date
Feb 4, 2026
Release: Nov 19, 2025
Close: Feb 4, 2026
The Project includes the following Work: Division A: Water Treatment Plant Campus Division A includes a new 1,800 gallon per minute filtration and Per- and Polyfluoroalkyl (PFAS) removal water treatment plant with related site improvements and accessories; associated pumps, piping, valves, structures, electrical work and appurtenances. Electrical work includes outside conduits, feeders, and light poles. Division B: Ground Storage Tanks Division B includes two (2) one million gallons (1,000,000 gallons) ground storage tanks. Work includes site grading, earthwork, foundation, steel erection, and coating. Foundation/concrete work to include valve vault, valve(s), and piping extend outside of the vault or foundation shall be included. Electrical conduits, conductors, and pressure sensors are not included in the contract. Division C: Underground Piping Division C includes all underground water main, water services, sanitary sewer, and storm sewer within 5' of the building/structure or foundation. In addition to the water main, all manhole structures (excluding the head tank) shall be included. Fire hydrants to flush the head tank shall be included in Division C work. This work includes the conversion of the raw water main to finish water main. This will require multiple mobilization to connect, disconnect, tap and plug the water mains.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →